Beneficiary Ornganisation Details:
Slovenian Nuclear Safety Administration:
http://www.sigov.si/ursjv/
Project Aims
Navigation path
Beneficiary Ornganisation Details:
Slovenian Nuclear Safety Administration:
http://www.sigov.si/ursjv/
Project Aims
Objective
Objective
Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 95 with the same Western and Eastern Utilities and NPPs.
Background
Objectives
Objectives
In the framework of the “Tacis Nuclear Safety Programme” it was decided to deliver training equipment for the personnel of the Aktau NPP (BN-350, fast breeder). The equipment covers the following items:
Objectives
Objectives
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
Objectives
Objectives
In the framework of the “Tacis Nuclear Safety Programme”, it was decided to improve the passive fire protection facilities of the BN-350 NPP (fast breeder) in Aktau, Kazakhstan. The project was divided into three lots:
Objective
Background
Background
Objectives
Objective
The overall purpose of the project was to: