Objective
The objective was to assist GAN in technical evaluation of the proposed safety upgrading measures, including design and operational aspects, related to Novovoronezh units 3 and 4.
Navigation path
Objective
The objective was to assist GAN in technical evaluation of the proposed safety upgrading measures, including design and operational aspects, related to Novovoronezh units 3 and 4.
Objectives
Objective
The overall purpose of the project was to: