Background
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
- Framatome (3) Apply Framatome filter
- SEBIM (2) Apply SEBIM filter
- Alstom (1) Apply Alstom filter
- Brühl&Kjaer (1) Apply Brühl&Kjaer filter
- CITA (1) Apply CITA filter
- DataLoop (1) Apply DataLoop filter
- Diaprom (1) Apply Diaprom filter
- EFCO (1) Apply EFCO filter
- FLIR (1) Apply FLIR filter
- Fortum (1) Apply Fortum filter
- IBS (1) Apply IBS filter
- Lamport (1) Apply Lamport filter
- MGPI (Mirion Technologies) (1) Apply MGPI (Mirion Technologies) filter
- Mitsui Babcock (1) Apply Mitsui Babcock filter
- Parcol (1) Apply Parcol filter
- Schneider Electric (1) Apply Schneider Electric filter
- SEMA Group (1) Apply SEMA Group filter
- Seres (1) Apply Seres filter
- Taprogge (1) Apply Taprogge filter
- Waters (1) Apply Waters filter
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Kalinin filter Kalinin (13)
- (-) Remove Beloyarsk filter Beloyarsk (7)
- (-) Remove Smolensk filter Smolensk (4)
- Zaporozhye (18) Apply Zaporozhye filter
- South Ukraine (15) Apply South Ukraine filter
- Balakovo (9) Apply Balakovo filter
- Kola (7) Apply Kola filter
- Rovno (6) Apply Rovno filter
- Aktau (4) Apply Aktau filter
- Novovoronezh (4) Apply Novovoronezh filter
- Khmelnitsky (2) Apply Khmelnitsky filter
- Leningrad (Sosnovy Bor) (1) Apply Leningrad (Sosnovy Bor) filter
Contract information field: Nature
Contract information field: Method of procurement
Objective
Background
Objective
Objective
Objectives
Background
Background
Objective
Objective
The objective of the project is to equip the BN 600 NPP with hardware, software and procedures for thermal visual inspection of the high voltage equipment for timely prevention of the accidents at the BN 600 NPP.
Beloyarsk Process Monitoring System (see projects R1.06/95E and R1.06/96B)
Kalinin Secondary water chemistry
Objective
The water quality on Kalinin Unit 2 has similar shortcomings as in Unit 1. The successful approach which was applied in project R1.03/92A for Kalinin Unit 1 shall be extended on Unit 2.
Kalinin Make up water preparation (I)
Objective
The water quality on Kalinin Unit 2 has similar shortcomings as in Unit 1. The successful approach which was applied in project R1.03/92A for Kalinin Unit 1 shall be extended on Unit 2.
Kalinin Make up water preparation (II)
Objective
The water quality on Kalinin Unit 2 has similar shortcomings as in Unit 1. The successful approach which was applied in project R1.03/92A for Kalinin Unit 1 shall be extended on Unit 2.
Objective
A general assessment was to be performed on how to improve the medium voltage supply at Kalinin. The assessment should cover medium voltage distribution associated with automation, supervision and cabling.
Deliverables of the assessment:
Objective
The purpose of this project is the continuation and finalization of work commenced with Tacis Project R 3.5/91.
Objective
The purpose of this project is the continuation and finalization of work commenced with Tacis Project R 3.5/91.
Objective
Objective
Objective