Objective
The objective was to assist GAN in technical evaluation of the proposed safety upgrading measures, including design and operational aspects, related to Novovoronezh units 3 and 4.
Navigation path
Objective
The objective was to assist GAN in technical evaluation of the proposed safety upgrading measures, including design and operational aspects, related to Novovoronezh units 3 and 4.
Objective
Project Aims
The project objective was to issue PSA reports for Novovoronezh NPP, in particular:
Objectives
Objective
Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 96, continued with TACIS 97 with the same Western and Eastern Utility.
Objective
Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 94 with the same Western and Eastern Utility and NPPs.
Background
The TACIS programmes for Nuclear Safety agreed upon between the European Commission and the relevant authorities of beneficiary states contained provisions for on-site assistance (OSA).
Objectives
Objectives
Objectives
Background
Objective
Objective
The objective of the project is to equip the BN 600 NPP with hardware, software and procedures for thermal visual inspection of the high voltage equipment for timely prevention of the accidents at the BN 600 NPP.
Beloyarsk Process Monitoring System (see projects R1.06/95E and R1.06/96B)
Objective
Objective
Objectives