Objectives
The objective of this project was to provide the Commission with an independent expert evaluation whether the upgraded Kalinin NPP unit 3 would be in line with European safety objectives and practices.
Project
Navigation path
Objectives
The objective of this project was to provide the Commission with an independent expert evaluation whether the upgraded Kalinin NPP unit 3 would be in line with European safety objectives and practices.
Project
Objective
Objective
General Objective
Objective
Objective
Background
Background
Objective
The objective is to provide assistance to Rosenergoatom (REA) by setting up a complete Project Management Structure (PMS) for completion and upgrading the NPP Kalinin unit 3.
This structure was intended to cover:
Objective
Objectives
Objective
Objective
The aim of the project is the replacement of the 8 existing safety valves on one Unit on the steam generators by modern Western safety valves.
Result
Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 94 with the same Western and Eastern Utility and NPPs.
Objective
The objective was to deliver the following items:
Kalinin Secondary water chemistry
Objective
The water quality on Kalinin Unit 2 has similar shortcomings as in Unit 1. The successful approach which was applied in project R1.03/92A for Kalinin Unit 1 shall be extended on Unit 2.
Kalinin Make up water preparation (I)
Objective
The water quality on Kalinin Unit 2 has similar shortcomings as in Unit 1. The successful approach which was applied in project R1.03/92A for Kalinin Unit 1 shall be extended on Unit 2.
Kalinin Make up water preparation (II)
Objective
The water quality on Kalinin Unit 2 has similar shortcomings as in Unit 1. The successful approach which was applied in project R1.03/92A for Kalinin Unit 1 shall be extended on Unit 2.
Objective
A general assessment was to be performed on how to improve the medium voltage supply at Kalinin. The assessment should cover medium voltage distribution associated with automation, supervision and cabling.
Deliverables of the assessment:
Background
Objective
The purpose of this project is the continuation and finalization of work commenced with Tacis Project R 3.5/91.