Objective
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
- Bosch (2) Apply Bosch filter
- Siemens (2) Apply Siemens filter
- BERRY (1) Apply BERRY filter
- DataLoop (1) Apply DataLoop filter
- EFCO (1) Apply EFCO filter
- Elektrogorsk Research and Engineering Center on NPP Safety (1) Apply Elektrogorsk Research and Engineering Center on NPP Safety filter
- SEBIM (1) Apply SEBIM filter
- SEMPELL AG (1) Apply SEMPELL AG filter
- Varta (1) Apply Varta filter
Contract information field: Sector
Contract information field: Types of activities
- (-) Remove Equipment Supply filter Equipment Supply (10)
- (-) Remove RBMK studies filter RBMK studies (1)
- On Site Assistance (4) Apply On Site Assistance filter
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Balakovo filter Balakovo (7)
- (-) Remove Beloyarsk filter Beloyarsk (2)
- (-) Remove Leningrad (Sosnovy Bor) filter Leningrad (Sosnovy Bor) (2)
- Kalinin (11) Apply Kalinin filter
- South Ukraine (10) Apply South Ukraine filter
- Zaporozhye (10) Apply Zaporozhye filter
- Kola (6) Apply Kola filter
- Aktau (4) Apply Aktau filter
- Novovoronezh (4) Apply Novovoronezh filter
- Rovno (3) Apply Rovno filter
- Smolensk (3) Apply Smolensk filter
Contract information field: Nature
Contract information field: Method of procurement
Objective
Background
Steam flow meters originally installed on the main steam lines are not reliable, and their failure led to several reactor scrams in the past, because steam flow measurement is used for controlling steam generator water level.
Objective
Objective
The original SG control valves had to be replaced by modern Western valves. CIS manufactured valves of the required quality were not available. Therefore a joint venture was founded by Tchechov Works and Siemens.
Result
Objective
The aim of the project was the replacement of the existing safety valves on the steam generators on one of the 4 Units by modern safety valves. The objective included supply of equipment, related services, spare parts, auxiliary equipment and tools.
Objective
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective - lot 2
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective
The objective was to replace 430 units of accumulator cells for safety related systems, among them control systems and SCRAM system at Balakovo Nuclear Power Plant.
Result
Objective
Objectives