Objective
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
- 2010 (1) Apply 2010 filter
- 2009 (1) Apply 2009 filter
- 2008 (1) Apply 2008 filter
- 2007 (1) Apply 2007 filter
- 2006 (6) Apply 2006 filter
- 2005 (3) Apply 2005 filter
- 2002 (5) Apply 2002 filter
- 2001 (4) Apply 2001 filter
- 2000 (2) Apply 2000 filter
- 1999 (1) Apply 1999 filter
- 1998 (3) Apply 1998 filter
- 1997 (14) Apply 1997 filter
- 1996 (19) Apply 1996 filter
- 1995 (16) Apply 1995 filter
- (-) Remove 1994 filter 1994 (23)
- 1993 (7) Apply 1993 filter
- 1992 (28) Apply 1992 filter
- 1991 (1) Apply 1991 filter
Contract information field: Status
Contract information field: Contractor
- Framatome (3) Apply Framatome filter
- Brühl&Kjaer (2) Apply Brühl&Kjaer filter
- CITA (1) Apply CITA filter
- Cotecna (1) Apply Cotecna filter
- DataLoop (1) Apply DataLoop filter
- EFCO (1) Apply EFCO filter
- IBS (1) Apply IBS filter
- IRSN (Institut de Radioprotection et de Surete Nucleaire) (1) Apply IRSN (Institut de Radioprotection et de Surete Nucleaire) filter
- Lamport (1) Apply Lamport filter
- MGPI (Mirion Technologies) (1) Apply MGPI (Mirion Technologies) filter
- NERSA (Centrale Nucleaire Europeenne a Neutrons Rapides) (1) Apply NERSA (Centrale Nucleaire Europeenne a Neutrons Rapides) filter
- Riskaudit (1) Apply Riskaudit filter
- Schneider Electric (1) Apply Schneider Electric filter
- SEBIM (1) Apply SEBIM filter
- Seres (1) Apply Seres filter
- Siemens (1) Apply Siemens filter
- Syseca (1) Apply Syseca filter
- Taprogge (1) Apply Taprogge filter
- Tecnatom (1) Apply Tecnatom filter
- Waters (1) Apply Waters filter
Contract information field: Sector
- DS - Design safety (incl. Off-Site Emergency Preparedness) (2) Apply DS - Design safety (incl. Off-Site Emergency Preparedness) filter
- RA - Regulatory Authorities (1) Apply RA - Regulatory Authorities filter
- WDS - Waste, Decommissioning and Safeguards (1) Apply WDS - Waste, Decommissioning and Safeguards filter
Contract information field: Types of activities
- Equipment Supply (16) Apply Equipment Supply filter
- Design safety (2) Apply Design safety filter
- Emergency Preparedness (1) Apply Emergency Preparedness filter
- On Site Assistance (1) Apply On Site Assistance filter
- Technical Support Organisations (1) Apply Technical Support Organisations filter
- Training (1) Apply Training filter
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Kalinin filter Kalinin (15)
- (-) Remove Rovno filter Rovno (4)
- (-) Remove Beloyarsk filter Beloyarsk (3)
- (-) Remove Mochovce filter Mochovce (1)
- Novovoronezh (11) Apply Novovoronezh filter
- South Ukraine (11) Apply South Ukraine filter
- Zaporozhye (11) Apply Zaporozhye filter
- Balakovo (10) Apply Balakovo filter
- Kola (8) Apply Kola filter
- Paks (6) Apply Paks filter
- Smolensk (6) Apply Smolensk filter
- Aktau (5) Apply Aktau filter
- Dukovany (5) Apply Dukovany filter
- Bohunice (4) Apply Bohunice filter
- Chernobyl (3) Apply Chernobyl filter
- Leningrad (Sosnovy Bor) (3) Apply Leningrad (Sosnovy Bor) filter
- Medzamor (2) Apply Medzamor filter
- Temelin (2) Apply Temelin filter
- Ignalina (1) Apply Ignalina filter
- Kozloduy (1) Apply Kozloduy filter
Contract information field: Nature
Contract information field: Method of procurement
Objectives
1) Background
In the framework of the Tacis 1994-95 programmes, the European Commission has agreed with the Ukrainian Goskomatom on the project of replacement of the Computer Information System (CIS) at Rovno NPP, Unit 1 & 2.
2) Objectives
1) Background
Background
Kalinin Secondary water chemistry
Objective
The water quality on Kalinin Unit 2 has similar shortcomings as in Unit 1. The successful approach which was applied in project R1.03/92A for Kalinin Unit 1 shall be extended on Unit 2.
Kalinin Make up water preparation (I)
Objective
The water quality on Kalinin Unit 2 has similar shortcomings as in Unit 1. The successful approach which was applied in project R1.03/92A for Kalinin Unit 1 shall be extended on Unit 2.
Kalinin Make up water preparation (II)
Objective
The water quality on Kalinin Unit 2 has similar shortcomings as in Unit 1. The successful approach which was applied in project R1.03/92A for Kalinin Unit 1 shall be extended on Unit 2.
Objective
A general assessment was to be performed on how to improve the medium voltage supply at Kalinin. The assessment should cover medium voltage distribution associated with automation, supervision and cabling.
Deliverables of the assessment:
Background
Objective
The purpose of this project is the continuation and finalization of work commenced with Tacis Project R 3.5/91.
Objective
The purpose of this project is the continuation and finalization of work commenced with Tacis Project R 3.5/91.
Objective
Objective
Objective
Objective
Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 94 with the same Western and Eastern Utility and NPPs.
Objective
The objective was to deliver the following items:
Objective
The aim of the project is the replacement of the 8 existing safety valves on one Unit on the steam generators by modern Western safety valves.
Result
Beneficiary Organization Details
Bohunice NPP, Mochovce NPP (Slovak Republic)
http://www.seas.sk
Dukovany NPP, Temelin NPP (Czech Republic)
http://www.cez.cz
Paks NPP (Hungary)