Objective
The aim of the project was to control the tritium release and migration in the environment during normal operation and in case of accidents.
Navigation path
Objective
The aim of the project was to control the tritium release and migration in the environment during normal operation and in case of accidents.
Objective
The aim of the project was to control the tritium release and migration in the environment during normal operation and in case of accidents.
See projects R1.06/97D and�R1.06/96B
Background
Objective R1.01/93
This On-Site-Assistance, in short “OSA”, project deals with the increase of the safety culture on the NPP. As in all other cases the OSA was performed by an EU utility, working with a team of Western and Russian experts.
Objective
Objective
The overall project aimed to develop and deliver simulation tools to be installed on the VVER-440-NPP sites (230/213). Multifunctional Simulators (MFS) had to be supplied and delivered to Novoronezh Training Centre and Kola NPP.
Objective (phase 2)
The objective of this project was to continue the work started in a first phase under the same project number. This project is to be seen as a contractual extension of the previous one with the same number R1.06/7/92.
Result
Background / Objective
Objective
The objective of the project was to implement the on-site assistance (OSA) at Kola NPP by a Western Consultant. This assistance by the Consultant was the subject of a formal contract between EC and the Consultant.
Result
Objective
The objective of this project was to prepare the basic design for the modernization of the Reactor Protection System on Units 3 and 4.
Result