Objective
The aim of the project was to control the tritium release and migration in the environment during normal operation and in case of accidents.
Navigation path
Objective
The aim of the project was to control the tritium release and migration in the environment during normal operation and in case of accidents.
Objective
The aim of the project was to control the tritium release and migration in the environment during normal operation and in case of accidents.
See projects R1.06/97D and�R1.06/96B
Background
Objective
Objective
The overall project aimed to develop and deliver simulation tools to be installed on the VVER-440-NPP sites (230/213). Multifunctional Simulators (MFS) had to be supplied and delivered to Novoronezh Training Centre and Kola NPP.
Objective (phase 2)
The objective of this project was to continue the work started in a first phase under the same project number. This project is to be seen as a contractual extension of the previous one with the same number R1.06/7/92.
Result
Background / Objective