Objective
The aim of the project was to control the tritium release and migration in the environment during normal operation and in case of accidents.
Navigation path
Objective
The aim of the project was to control the tritium release and migration in the environment during normal operation and in case of accidents.
Objective
The aim of the project was to control the tritium release and migration in the environment during normal operation and in case of accidents.
See projects R1.06/97D and�R1.06/96B
Background
Objective
The aim of the project is the refurbishment of the present Process Monitoring System (PMS) with full consideration of the possibility to operate with PMS functions in the present as well as in the new system.
Background
Background
Background
Background
Objectives
The project was carried out in the framework of the Tacis 96 On-site Assistance activities of the Armenia NPP Unit 2.
The aim of this specific project A1.01/96F is the procurement of a system to detect possible leakage between the primary and secondary loops.
Objectives
Objectives
Objectives
Objectives
Objectives
Objective
Project Background
Objective
Full Project Title:
Services required for detailed design studies aiming at defining the optimal solution for the qualification of the LBB (Leak Before Break) concept of the primary circuit including the surge line at the Unit 2 of ANPP.