1) Background
Previous SG (steam generator) safety valves experienced several design shortcomings:
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
- SEBIM (2) Apply SEBIM filter
- Brühl&Kjaer (1) Apply Brühl&Kjaer filter
- Framatome (1) Apply Framatome filter
- Lisega (1) Apply Lisega filter
- Mecatiss (1) Apply Mecatiss filter
- MGPI (Mirion Technologies) (1) Apply MGPI (Mirion Technologies) filter
- Rados (1) Apply Rados filter
- SEMA Group (1) Apply SEMA Group filter
- Trelleborg (1) Apply Trelleborg filter
- Velan (1) Apply Velan filter
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Novovoronezh filter Novovoronezh (7)
- (-) Remove Rovno filter Rovno (3)
- (-) Remove Beloyarsk filter Beloyarsk (1)
- Zaporozhye (10) Apply Zaporozhye filter
- Medzamor (9) Apply Medzamor filter
- South Ukraine (6) Apply South Ukraine filter
- Balakovo (5) Apply Balakovo filter
- Kalinin (3) Apply Kalinin filter
- Kola (3) Apply Kola filter
- Khmelnitsky (1) Apply Khmelnitsky filter
- Leningrad (Sosnovy Bor) (1) Apply Leningrad (Sosnovy Bor) filter
- Smolensk (1) Apply Smolensk filter
Contract information field: Nature
Contract information field: Method of procurement
- (-) Remove Special Fund (Procurement Agent) filter Special Fund (Procurement Agent) (11)
- Direct Agreement (7) Apply Direct Agreement filter
Beneficiary Organisation: Energoatom - NAEK (beneficiary) and Rovno NPP (end user)
1) Background
Beneficiary organisation: Energoatom, Ukraine
1) Background
Rovno NPP unit 3 is equipped with some foreign made piston shock absorbers. Due to difficult economic conditions, it was difficult to Rovno NPP to procure relevant spare parts and to implement adequate maintenance.
Objective
The aim of the project is the refurbishment of the present Process Monitoring System (PMS) with full consideration of the possibility to operate with PMS functions in the present as well as in the new system.
Background
Objective
Unit 5 is equipped with four SGs. To protect the SGs and corresponding system of live steam piping from pressure excess (for example at abnormal operation or in case of the accident) the following systems are to be replaced:
Objective
Objective
Procurement of Spare Parts for the Diagnostic Systems in Units 3 and 4.
At the beginning of 1990 VNIIAES has purchased from Siemens diagnostic systems like Acoustic Leakage-Detection, Loose Part Detection (Type SUES, KUES, ALUES) on a large scale.
Objective
Procurement of Spare Parts for the Diagnostic Systems in Units 3 and 4.
At the beginning of 1990 VNIIAES has purchased from Siemens diagnostic systems like Acoustic Leakage-Detection, Loose Part Detection (Type SUES, KUES, ALUES) on a large scale.
Objective
Procurement of Spare Parts (app. 100 different items) for different valves for Unit 5.
The original valves, 48 valves in total, for which spare parts are necessary (Gate valves, Globe valves, Check valves) were supplied in 1976 by GEC Alsthom-VELAN.
Background
The TACIS programmes for Nuclear Safety agreed upon between the European Commission and the relevant authorities of beneficiary states contained provisions for on-site assistance (OSA).