Background
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
- EDF (Electricite de France) (7) Apply EDF (Electricite de France) filter
- Bopp & Reuther (2) Apply Bopp & Reuther filter
- Framatome (2) Apply Framatome filter
- SEBIM (2) Apply SEBIM filter
- Alstom (1) Apply Alstom filter
- Babcock Sempell (1) Apply Babcock Sempell filter
- ENVINET (1) Apply ENVINET filter
- Herion (1) Apply Herion filter
- Intercontrole (1) Apply Intercontrole filter
- Lisega (1) Apply Lisega filter
- Persta (1) Apply Persta filter
- Rados (1) Apply Rados filter
- RE (Rheinisch-Westfälisches Elektrizitätswerk) (1) Apply RE (Rheinisch-Westfälisches Elektrizitätswerk) filter
- Riskaudit (1) Apply Riskaudit filter
- Syseca (1) Apply Syseca filter
- Weir Valves & Controls (1) Apply Weir Valves & Controls filter
Contract information field: Sector
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
- (-) Remove EnergoAtom filter EnergoAtom (24)
- (-) Remove Rostechnadzor filter Rostechnadzor (1)
- Rosenergoatom (22) Apply Rosenergoatom filter
- GAN (Ukraine) (1) Apply GAN (Ukraine) filter
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Rovno filter Rovno (24)
- (-) Remove Beloyarsk filter Beloyarsk (1)
- Zaporozhye (63) Apply Zaporozhye filter
- South Ukraine (42) Apply South Ukraine filter
- Khmelnitsky (9) Apply Khmelnitsky filter
- Kola (3) Apply Kola filter
- Kalinin (1) Apply Kalinin filter
- Novovoronezh (1) Apply Novovoronezh filter
Contract information field: Nature
Contract information field: Method of procurement
Background
The primary overpressure protection system is designed to protect the reactor equipment and pipelines against primary circuit overpressure phenomena during different transients.
Background
Rovno NPP located in Kuznetsovsk, Rivne Region, Ukraine comprised 4 power units thereof 2 VVER440 type reactors and 2 VVER1000 type reactors.
Project Description (to be included in the Database)
The aims of the On-Site Assistance at the RNPP have been:
1. to improve operational safety culture of the RNPP (Soft OSA) through general On-Site Assistance to RNPP eg.
1) Background
This contract is for the the design, manufacture, delivery, etc.
Objectives
The present TACIS project U1.01/95C aims at replacing the 12 SG (steam generator) safety valves (2 per SG) of each unit 1 and unit 2 of Rovno NPP. The new safety valves should have the following functions:
1) Background
Continuation of TACIS OSA (On-Site Assistance) at Rovno NPP.
U1.01/98 & U1.01/98A
1) Background
1) Background
Beneficiary organisation: Energoatom, Ukraine
1) Background
Previous SG (steam generator) safety valves experienced several design shortcomings:
Beneficiary Organisation: RNPP
1) Background
1) Background
Previous SG (steam generator) safety valves experienced several design shortcomings:
Beneficiary Organisation: Energoatom - NAEK (beneficiary) and Rovno NPP (end user)
1) Background
Beneficiary organisation: Energoatom, Ukraine
1) Background
Rovno NPP unit 3 is equipped with some foreign made piston shock absorbers. Due to difficult economic conditions, it was difficult to Rovno NPP to procure relevant spare parts and to implement adequate maintenance.
1) Background
In the framework of the Tacis 1994-95 programmes, the European Commission has agreed with the Ukrainian Goskomatom on the project of replacement of the Computer Information System (CIS) at Rovno NPP, Unit 1 & 2.
2) Objectives
1) Background
As economical situation of Ukrainian NPPs was very difficult in the early 80’s, there was an urgent need for spare parts in order to allow operation of Ukrainian NPPs.
1) Background
As economical situation of Ukrainian NPPs was very difficult in the early 80’s, there was an urgent need for spare parts in order to allow operation of Ukrainian NPPs.
1) Background
As economical situation of Ukrainian NPPs was very difficult in the early 80’s, there was an urgent need for spare parts in order to allow operation of Ukrainian NPPs.