Objective (phase 2)
The objective of this project was to continue the work started in a first phase under the same project number. This project is to be seen as a contractual extension of the previous one with the same number R1.06/7/92.
Result
Navigation path
Objective (phase 2)
The objective of this project was to continue the work started in a first phase under the same project number. This project is to be seen as a contractual extension of the previous one with the same number R1.06/7/92.
Result
Objective
Objective
The project’s objective covered research, design, supply and commissioning of:
Objective
On request of the Beneficiary a simulator (see Project R1.06/93) was provided for instruction and proficiency training of operator teams to improve their skills and knowledge to operate the BN 600 NPP at Beloyarsk.
Project Description
Background
Background
The primary overpressure protection system is designed to protect the reactor equipment and pipelines against primary circuit overpressure phenomena during different transients.
Background
Rovno NPP located in Kuznetsovsk, Rivne Region, Ukraine comprised 4 power units thereof 2 VVER440 type reactors and 2 VVER1000 type reactors.
Project Description (to be included in the Database)
The aims of the On-Site Assistance at the RNPP have been:
1. to improve operational safety culture of the RNPP (Soft OSA) through general On-Site Assistance to RNPP eg.
U1.01/95 - Phase 3
1) Background
Objectives
This contract is for the the design, manufacture, delivery, etc.
Objectives
The present TACIS project U1.01/95C aims at replacing the 12 SG (steam generator) safety valves (2 per SG) of each unit 1 and unit 2 of Rovno NPP. The new safety valves should have the following functions:
Objectives
The present TACIS project U1.01/96C aims at providing spare parts for valves for unit 3 pressuriser and pressure accumulators, which were originally supplied by German companies Sempell and Bopp & Reuther.
Background
1) Background
Continuation of TACIS OSA (On-Site Assistance) at Rovno NPP.
1) Background
Continuation of TACIS OSA (On-Site Assistance) at Rovno NPP.
Objective
Background
U1.01/98 & U1.01/98A