Background
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
- (-) Remove Closed filter Closed (11)
Contract information field: Contractor
- EDF (Electricite de France) (2) Apply EDF (Electricite de France) filter
- TVONS (TVO Nuclear Services Oy) (2) Apply TVONS (TVO Nuclear Services Oy) filter
- All Trade Italy (1) Apply All Trade Italy filter
- Areva (1) Apply Areva filter
- Canberra (1) Apply Canberra filter
- Iberdrola (1) Apply Iberdrola filter
- KLE (Kernkraftwerke Lippe-Ems) (1) Apply KLE (Kernkraftwerke Lippe-Ems) filter
- SUE SIA Radon (State Unitarian Enterprise, Scientific and Industrial Association. Radon) (1) Apply SUE SIA Radon (State Unitarian Enterprise, Scientific and Industrial Association. Radon) filter
- WEDECO (1) Apply WEDECO filter
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
- (-) Remove Rosenergoatom filter Rosenergoatom (11)
Contract information field: Meta geographical zone
Contract information field: Installation Types
- (-) Remove (none) filter (none) (11)
Contract information field: Nuclear Power Plant
- (-) Remove Kola filter Kola (11)
- (-) Remove Bilibino filter Bilibino (0)
- Smolensk (9) Apply Smolensk filter
- Beloyarsk (7) Apply Beloyarsk filter
- Leningrad (Sosnovy Bor) (7) Apply Leningrad (Sosnovy Bor) filter
- Balakovo (6) Apply Balakovo filter
- Kalinin (6) Apply Kalinin filter
- Novovoronezh (5) Apply Novovoronezh filter
Contract information field: Nature
Contract information field: Method of procurement
Background
Background
Background
Background
Background
Kola NPP located in Murmansk Oblast in north western Russia comprised 4 power units of VVER 440 type reactors. Unit 1 is in operation since 1973, unit 2 since 1974, unit 3 since 1982 and unit 4 since 1984.
Objective
Objective R1.01/93
This On-Site-Assistance, in short “OSA”, project deals with the increase of the safety culture on the NPP. As in all other cases the OSA was performed by an EU utility, working with a team of Western and Russian experts.
Objective
The objective of the project was to implement the on-site assistance (OSA) at Kola NPP by a Western Consultant. This assistance by the Consultant was the subject of a formal contract between EC and the Consultant.
Result
Objective
The objective of this project was to prepare the basic design for the modernization of the Reactor Protection System on Units 3 and 4.
Result
Objective:
Overall Objective