Objective
Search
Contract information field: Programme
Contract information field: Country
- (-) Remove Russia filter Russia (26)
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
- KGG (Kernkraftwerk Gundremmingen) (4) Apply KGG (Kernkraftwerk Gundremmingen) filter
- MGPI (Mirion Technologies) (2) Apply MGPI (Mirion Technologies) filter
- RRCKI ( Russian Research Centre Kurchatov Institute) (2) Apply RRCKI ( Russian Research Centre Kurchatov Institute) filter
- Belgatom (1) Apply Belgatom filter
- Brühl&Kjaer (1) Apply Brühl&Kjaer filter
- CIT (1) Apply CIT filter
- CORYS T.E.S.S. (1) Apply CORYS T.E.S.S. filter
- Empresarios Agrupados (1) Apply Empresarios Agrupados filter
- Framatome (1) Apply Framatome filter
- Industrial Marketing (1) Apply Industrial Marketing filter
- Italtrend (1) Apply Italtrend filter
- Mecatiss (1) Apply Mecatiss filter
- Protem (1) Apply Protem filter
- RE (Rheinisch-Westfälisches Elektrizitätswerk) (1) Apply RE (Rheinisch-Westfälisches Elektrizitätswerk) filter
- Riskaudit (1) Apply Riskaudit filter
- Schneider Electric (1) Apply Schneider Electric filter
- SEBIM (1) Apply SEBIM filter
- SOGIN (Societa Gestione Impianti Nucleari) (1) Apply SOGIN (Societa Gestione Impianti Nucleari) filter
- Telerob (1) Apply Telerob filter
- Trelleborg (1) Apply Trelleborg filter
- Velan (1) Apply Velan filter
Contract information field: Sector
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
- (-) Remove (none) filter (none) (26)
Contract information field: Nuclear Power Plant
- (-) Remove Novovoronezh filter Novovoronezh (24)
- (-) Remove Bilibino filter Bilibino (2)
- Kalinin (54) Apply Kalinin filter
- Balakovo (35) Apply Balakovo filter
- Beloyarsk (24) Apply Beloyarsk filter
- Smolensk (23) Apply Smolensk filter
- Kola (20) Apply Kola filter
- Leningrad (Sosnovy Bor) (17) Apply Leningrad (Sosnovy Bor) filter
Contract information field: Nature
Contract information field: Method of procurement
- (-) Remove Direct Agreement filter Direct Agreement (14)
- (-) Remove Special Fund (Procurement Agent) filter Special Fund (Procurement Agent) (12)
- Restricted Call for Tender (12) Apply Restricted Call for Tender filter
- Open Call for Tender (6) Apply Open Call for Tender filter
- Negotiated Procedure (4) Apply Negotiated Procedure filter
Background
Objective
Unit 5 is equipped with four SGs. To protect the SGs and corresponding system of live steam piping from pressure excess (for example at abnormal operation or in case of the accident) the following systems are to be replaced:
Objective
Objective
Procurement of Spare Parts for the Diagnostic Systems in Units 3 and 4.
At the beginning of 1990 VNIIAES has purchased from Siemens diagnostic systems like Acoustic Leakage-Detection, Loose Part Detection (Type SUES, KUES, ALUES) on a large scale.
Objective
Procurement of Spare Parts for the Diagnostic Systems in Units 3 and 4.
At the beginning of 1990 VNIIAES has purchased from Siemens diagnostic systems like Acoustic Leakage-Detection, Loose Part Detection (Type SUES, KUES, ALUES) on a large scale.
Objective
Procurement of Spare Parts (app. 100 different items) for different valves for Unit 5.
The original valves, 48 valves in total, for which spare parts are necessary (Gate valves, Globe valves, Check valves) were supplied in 1976 by GEC Alsthom-VELAN.
Objectives
Objectives
Objectives
Background
The TACIS programmes for Nuclear Safety agreed upon between the European Commission and the relevant authorities of beneficiary states contained provisions for on-site assistance (OSA).
Bilibino NPP
Bilibino nuclear power and district heating plant (NPDHP) was the first nuclear power station built beyond the Polar Circle in the central part of the Chukotka peninsula, and it provides electricity for the regional mining and gold mining industries.
Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 96, continued with TACIS 97 with the same Western and Eastern Utility.
Objective
The wider objective of the project was intended to strengthen the Nuclear Safety through the support of the training system and training facilities at Russian NPP’s.
Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance at Novovoronezh NPP, which started with TACIS 96, continued with TACIS 98 with the same Western Utility.
Objectives
Objectives
Objectives
Project Aims
The project objective was to issue PSA reports for Novovoronezh NPP, in particular:
Objectives