Objective
Search
Contract information field: Programme
- (-) Remove TACIS filter TACIS (26)
Contract information field: Country
- (-) Remove Russia filter Russia (26)
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
- Framatome (3) Apply Framatome filter
- Siemens (3) Apply Siemens filter
- Bosch (2) Apply Bosch filter
- OKBM Mechanical Engineering (2) Apply OKBM Mechanical Engineering filter
- SEMPELL AG (2) Apply SEMPELL AG filter
- Balduf (1) Apply Balduf filter
- Bopp & Reuther (1) Apply Bopp & Reuther filter
- Delta Test (1) Apply Delta Test filter
- Diakont (1) Apply Diakont filter
- Elektrogorsk Research and Engineering Center on NPP Safety (1) Apply Elektrogorsk Research and Engineering Center on NPP Safety filter
- MGPI (Mirion Technologies) (1) Apply MGPI (Mirion Technologies) filter
- MICA (1) Apply MICA filter
- Schneider Electric (1) Apply Schneider Electric filter
- SEBIM (1) Apply SEBIM filter
- Taprogge (1) Apply Taprogge filter
- Technos (1) Apply Technos filter
- Varta (1) Apply Varta filter
- VHB Germany (1) Apply VHB Germany filter
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Balakovo filter Balakovo (25)
- (-) Remove Bilibino filter Bilibino (1)
- Kalinin (40) Apply Kalinin filter
- Beloyarsk (14) Apply Beloyarsk filter
- Novovoronezh (11) Apply Novovoronezh filter
- Smolensk (11) Apply Smolensk filter
- Kola (9) Apply Kola filter
- Leningrad (Sosnovy Bor) (6) Apply Leningrad (Sosnovy Bor) filter
Contract information field: Nature
Contract information field: Method of procurement
- (-) Remove Special Fund (Procurement Agent) filter Special Fund (Procurement Agent) (26)
- Direct Agreement (11) Apply Direct Agreement filter
- Open Call for Tender (4) Apply Open Call for Tender filter
- Restricted Call for Tender (2) Apply Restricted Call for Tender filter
- Negotiated Procedure (1) Apply Negotiated Procedure filter
Background
The TACIS programmes for Nuclear Safety agreed upon between the European Commission and the relevant authorities of beneficiary states contained provisions for on-site assistance (OSA).
Objective
Objective
Objective
The original SG control valves had to be replaced by modern Western valves. CIS manufactured valves of the required quality were not available. Therefore a joint venture was founded by Tchechov Works and Siemens.
Result
Objective
The aim of the project was the replacement of the existing safety valves on the steam generators on one of the 4 Units by modern safety valves. The objective included supply of equipment, related services, spare parts, auxiliary equipment and tools.
Objective
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective - lot 2
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective
The objective was to replace 430 units of accumulator cells for safety related systems, among them control systems and SCRAM system at Balakovo Nuclear Power Plant.
Result
Objectives
Two prototypes of ECCS-pump (Emergency Core Cooling System) intake filters were designed, supplied and installed in the framework of this project, including the budget of project R1.02/96C.
Objectives
Objective
Objectives
Objective
The project includes procurement of special maintenance equipment for large scale repair and replacement of heavy components like steam generators, pipes and valves.
The envisaged tools and equipment include:
Objective
This project consists of replacement of the current 2 (two) booster pumps for the feed water pumps in one Balakovo NPP.
Result
This project was combined with project R1.02/96A and jointly tendered, contracted and supplied.
Objective
This project consists of replacement of the current 2 (two) booster pumps for the feed water pumps in one Balakovo NPP.
Result
This project was combined with project R1.02/95G and jointly tendered, contracted and supplied.
Background
Steam flow meters originally installed on the main steam lines are not reliable, and their failure led to several reactor scrams in the past, because steam flow measurement is used for controlling steam generator water level.
Background
6kV circuit breakers originally installed in the units at Balakovo NPP are of the VES-6 type, and the related cabinets are of KE-6 type. Their supplier is Rovno high voltage equipment plant, Ukraine.
Introduction
Objectives
The project aimed to the modernization of the Fuel Loading Machine (FLM) at Balakovo NPP, in order to meet the machine availability and in compliance with the operation requirements of the NPP.