The objective of the project was to implement the on-site assistance (OSA) at Kola NPP by a Western Consultant. This assistance by the Consultant was the subject of a formal contract between EC and the Consultant.
Result
Objective
The objective of this project was to prepare the basic design for the modernization of the Reactor Protection System on Units 3 and 4.
Result
Background / Objective
Objective R1.01/93
This On-Site-Assistance, in short “OSA”, project deals with the increase of the safety culture on the NPP. As in all other cases the OSA was performed by an EU utility, working with a team of Western and Russian experts.
Objectives
The objective of the Tacis project consists in providing technical support to Gosatomnadzor of RF in its safety evaluation of the Kola units 3 & 4 upgrading Instrumentation and Control programme.
Background
Objective
Background
Kola NPP located in Murmansk Oblast in north western Russia comprised 4 power units of VVER 440 type reactors. Unit 1 is in operation since 1973, unit 2 since 1974, unit 3 since 1982 and unit 4 since 1984.
Bilibino NPP
Bilibino nuclear power and district heating plant (NPDHP) was the first nuclear power station built beyond the Polar Circle in the central part of the Chukotka peninsula, and it provides electricity for the regional mining and gold mining industries.
Background