Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 94 with the same Western and Eastern Utility and NPPs.
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
- 2005 (1) Apply 2005 filter
- 2004 (1) Apply 2004 filter
- 2003 (2) Apply 2003 filter
- 2002 (1) Apply 2002 filter
- 2001 (5) Apply 2001 filter
- 2000 (1) Apply 2000 filter
- 1998 (4) Apply 1998 filter
- (-) Remove 1997 filter 1997 (19)
- 1996 (9) Apply 1996 filter
- 1995 (13) Apply 1995 filter
- (-) Remove 1994 filter 1994 (19)
- 1992 (7) Apply 1992 filter
Contract information field: Status
- (-) Remove Closed filter Closed (19)
Contract information field: Contractor
- Bosch (2) Apply Bosch filter
- EFCO (2) Apply EFCO filter
- RRCKI ( Russian Research Centre Kurchatov Institute) (2) Apply RRCKI ( Russian Research Centre Kurchatov Institute) filter
- Ansaldo Energia (1) Apply Ansaldo Energia filter
- Balduf (1) Apply Balduf filter
- BERRY (1) Apply BERRY filter
- EDF (Electricite de France) (1) Apply EDF (Electricite de France) filter
- Elektrogorsk Research and Engineering Center on NPP Safety (1) Apply Elektrogorsk Research and Engineering Center on NPP Safety filter
- Framatome (1) Apply Framatome filter
- SEBIM (1) Apply SEBIM filter
- SEMPELL AG (1) Apply SEMPELL AG filter
- Siemens (1) Apply Siemens filter
- UNIT EXPORT (1) Apply UNIT EXPORT filter
- Varta (1) Apply Varta filter
- VTN (1) Apply VTN filter
Contract information field: Sector
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Balakovo filter Balakovo (13)
- (-) Remove Aktau filter Aktau (6)
- (-) Remove Bilibino filter Bilibino (0)
- Zaporozhye (23) Apply Zaporozhye filter
- Kalinin (18) Apply Kalinin filter
- South Ukraine (17) Apply South Ukraine filter
- Novovoronezh (11) Apply Novovoronezh filter
- Beloyarsk (9) Apply Beloyarsk filter
- Kola (9) Apply Kola filter
- Smolensk (9) Apply Smolensk filter
- Rovno (7) Apply Rovno filter
- Chernobyl (4) Apply Chernobyl filter
- Leningrad (Sosnovy Bor) (4) Apply Leningrad (Sosnovy Bor) filter
- Medzamor (4) Apply Medzamor filter
- Khmelnitsky (3) Apply Khmelnitsky filter
Contract information field: Nature
Contract information field: Method of procurement
Objective
In the existing fuel loading machines Instrumentation and Control errors in fuel positioning occurred and due to malfunction of the electronics all limiting blockings could run out of function.
Objectives
Objectives
Objective
Background
Steam flow meters originally installed on the main steam lines are not reliable, and their failure led to several reactor scrams in the past, because steam flow measurement is used for controlling steam generator water level.
Background
6kV circuit breakers originally installed in the units at Balakovo NPP are of the VES-6 type, and the related cabinets are of KE-6 type. Their supplier is Rovno high voltage equipment plant, Ukraine.
Objectives
Objectives
In the framework of the “Tacis Nuclear Safety Programme” it was decided to deliver training equipment for the personnel of the Aktau NPP (BN-350, fast breeder). The equipment covers the following items:
Objectives
Objectives
Objective
Objective
Objective
The original SG control valves had to be replaced by modern Western valves. CIS manufactured valves of the required quality were not available. Therefore a joint venture was founded by Tchechov Works and Siemens.
Result
Objective
The aim of the project was the replacement of the existing safety valves on the steam generators on one of the 4 Units by modern safety valves. The objective included supply of equipment, related services, spare parts, auxiliary equipment and tools.
Objective
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective - lot 2
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective
The objective was to replace 430 units of accumulator cells for safety related systems, among them control systems and SCRAM system at Balakovo Nuclear Power Plant.
Result
Objectives
Two prototypes of ECCS-pump (Emergency Core Cooling System) intake filters were designed, supplied and installed in the framework of this project, including the budget of project R1.02/96C.