Objective
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Navigation path
Objective
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective - lot 2
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Background
Steam flow meters originally installed on the main steam lines are not reliable, and their failure led to several reactor scrams in the past, because steam flow measurement is used for controlling steam generator water level.
Background
Balakovo Nuclear Power Plant has four units completed and in operation; all units are of the VVER 1000-V320 type.
Objective
Objective
In the existing fuel loading machines Instrumentation and Control errors in fuel positioning occurred and due to malfunction of the electronics all limiting blockings could run out of function.