Objective
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Navigation path
Objective
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective - lot 2
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Background
Steam flow meters originally installed on the main steam lines are not reliable, and their failure led to several reactor scrams in the past, because steam flow measurement is used for controlling steam generator water level.
Objective
Since the Soviet Union purchased a number of valves in the West, mainly in Germany, parts for valves urgently to be replaced have been asked for by the Beneficiary to be funded in the framework of TACIS.
Background
Balakovo Nuclear Power Plant has four units completed and in operation; all units are of the VVER 1000-V320 type.