Background
Steam flow meters originally installed on the main steam lines are not reliable, and their failure led to several reactor scrams in the past, because steam flow measurement is used for controlling steam generator water level.
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
- (-) Remove Bosch filter Bosch (2)
- (-) Remove OKBM Mechanical Engineering filter OKBM Mechanical Engineering (2)
- (-) Remove Elektrogorsk Research and Engineering Center on NPP Safety filter Elektrogorsk Research and Engineering Center on NPP Safety (1)
- (-) Remove Schneider Electric filter Schneider Electric (1)
- Framatome (3) Apply Framatome filter
- Siemens (3) Apply Siemens filter
- SEMPELL AG (2) Apply SEMPELL AG filter
- Bopp & Reuther (1) Apply Bopp & Reuther filter
- Delta Test (1) Apply Delta Test filter
- Diakont (1) Apply Diakont filter
- MGPI (Mirion Technologies) (1) Apply MGPI (Mirion Technologies) filter
- MICA (1) Apply MICA filter
- SEBIM (1) Apply SEBIM filter
- Taprogge (1) Apply Taprogge filter
- Technos (1) Apply Technos filter
- Varta (1) Apply Varta filter
- VHB Germany (1) Apply VHB Germany filter
Contract information field: Types of activities
- (-) Remove Equipment Supply filter Equipment Supply (6)
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Balakovo filter Balakovo (5)
- (-) Remove Bilibino filter Bilibino (1)
- Kalinin (1) Apply Kalinin filter
Contract information field: Nature
Contract information field: Method of procurement
- (-) Remove Special Fund (Procurement Agent) filter Special Fund (Procurement Agent) (6)
Objective
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective - lot 2
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective
This project consists of replacement of the current 2 (two) booster pumps for the feed water pumps in one Balakovo NPP.
Result
This project was combined with project R1.02/96A and jointly tendered, contracted and supplied.
Objective
This project consists of replacement of the current 2 (two) booster pumps for the feed water pumps in one Balakovo NPP.
Result
This project was combined with project R1.02/95G and jointly tendered, contracted and supplied.
Objective