Project Aims
The project objective was to issue PSA reports for Novovoronezh NPP, in particular:
Navigation path
Project Aims
The project objective was to issue PSA reports for Novovoronezh NPP, in particular:
Objectives
Objective
Objective
General Objective
Tractebel, the European Commission’s On Site Assistance Consultant at Kalinin NPP, recommended the European Commission to sign a direct agreement with Auxitrol for providing 59 electrical penetrations to Kalinin NPP units 1�& 2.
Objective
Background
Introduction
Objectives
Background
1. Background
Objective
The objective of the project was the design of a facility for removal of unsorted solid wastes, stored at NPP site, from the storage pits, and sorting the wastes for eventual transport to a conditioning unit.
Project Background
Appropriate water chemistry of both primary (nuclear) and secondary (non-nuclear) cooling circuits of a nuclear power plant is necessary to maintain safe, reliable and economical operation of the plant. Among others, it helps to
Objective
The objective was to assist GAN in technical evaluation of the proposed safety upgrading measures, including design and operational aspects, related to Novovoronezh units 3 and 4.
Background
The TACIS programmes for Nuclear Safety agreed upon between the European Commission and the relevant authorities of beneficiary states contained provisions for on-site assistance (OSA).
Objective
The overall project aimed to develop and deliver simulation tools to be installed on the VVER-440-NPP sites (230/213). Multifunctional Simulators (MFS) had to be supplied and delivered to Novoronezh Training Centre and Kola NPP.
Objectives
Objectives
Objectives
Objectives