Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 95 with the same Western and Eastern Utilities and NPPs.
Search
Contract information field: Programme
Contract information field: Country
- (-) Remove Russia filter Russia (23)
Contract information field: Budget year
- 2007 (1) Apply 2007 filter
- 2004 (6) Apply 2004 filter
- 2003 (1) Apply 2003 filter
- 2001 (1) Apply 2001 filter
- 2000 (2) Apply 2000 filter
- 1999 (1) Apply 1999 filter
- 1998 (1) Apply 1998 filter
- 1997 (2) Apply 1997 filter
- 1996 (1) Apply 1996 filter
- 1995 (2) Apply 1995 filter
- 1994 (1) Apply 1994 filter
- 1992 (4) Apply 1992 filter
Contract information field: Status
Contract information field: Contractor
- Magnox Electric (6) Apply Magnox Electric filter
- Areva (2) Apply Areva filter
- EDF (Electricite de France) (2) Apply EDF (Electricite de France) filter
- Iberdrola (2) Apply Iberdrola filter
- TVONS (TVO Nuclear Services Oy) (2) Apply TVONS (TVO Nuclear Services Oy) filter
- All Trade Italy (1) Apply All Trade Italy filter
- British Energy (1) Apply British Energy filter
- Canberra (1) Apply Canberra filter
- KLE (Kernkraftwerke Lippe-Ems) (1) Apply KLE (Kernkraftwerke Lippe-Ems) filter
- SGN (Societe generale pour les techniques nouvelles) (1) Apply SGN (Societe generale pour les techniques nouvelles) filter
- SOGIN (Societa Gestione Impianti Nucleari) (1) Apply SOGIN (Societa Gestione Impianti Nucleari) filter
- SUE SIA Radon (State Unitarian Enterprise, Scientific and Industrial Association. Radon) (1) Apply SUE SIA Radon (State Unitarian Enterprise, Scientific and Industrial Association. Radon) filter
- VT Nuclear Services (1) Apply VT Nuclear Services filter
- WEDECO (1) Apply WEDECO filter
Contract information field: Types of activities
- (-) Remove On Site Assistance filter On Site Assistance (23)
- Equipment Supply (22) Apply Equipment Supply filter
- Technical Support Organisations (5) Apply Technical Support Organisations filter
- Design safety (3) Apply Design safety filter
- RBMK studies (1) Apply RBMK studies filter
- Studies (1) Apply Studies filter
- Waste Management (1) Apply Waste Management filter
Contract information field: Partner (Beneficiary)
Contract information field: Meta geographical zone
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Kola filter Kola (13)
- (-) Remove Leningrad (Sosnovy Bor) filter Leningrad (Sosnovy Bor) (9)
- (-) Remove Bilibino filter Bilibino (1)
- Smolensk (18) Apply Smolensk filter
- Beloyarsk (12) Apply Beloyarsk filter
- Novovoronezh (11) Apply Novovoronezh filter
- Kalinin (10) Apply Kalinin filter
- Balakovo (9) Apply Balakovo filter
Contract information field: Nature
Contract information field: Method of procurement
Background
Background
Background
Background
Background
Background
Background
Kola NPP located in Murmansk Oblast in north western Russia comprised 4 power units of VVER 440 type reactors. Unit 1 is in operation since 1973, unit 2 since 1974, unit 3 since 1982 and unit 4 since 1984.
Bilibino NPP
Bilibino nuclear power and district heating plant (NPDHP) was the first nuclear power station built beyond the Polar Circle in the central part of the Chukotka peninsula, and it provides electricity for the regional mining and gold mining industries.
Background
Objective
Objective
Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 97 with the same Western and Eastern Utility and NPPs.
Objective
Objective R1.01/93
This On-Site-Assistance, in short “OSA”, project deals with the increase of the safety culture on the NPP. As in all other cases the OSA was performed by an EU utility, working with a team of Western and Russian experts.
Objective
Objective
Objective
The objective of the project was to implement the on-site assistance (OSA) at Kola NPP by a Western Consultant. This assistance by the Consultant was the subject of a formal contract between EC and the Consultant.
Result
Objective
The objective of this project was to prepare the basic design for the modernization of the Reactor Protection System on Units 3 and 4.
Result