Background
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
- (-) Remove Closed filter Closed (13)
Contract information field: Contractor
- Bosch (2) Apply Bosch filter
- SEBIM (2) Apply SEBIM filter
- Siemens (2) Apply Siemens filter
- Elektrogorsk Research and Engineering Center on NPP Safety (1) Apply Elektrogorsk Research and Engineering Center on NPP Safety filter
- Framatome (1) Apply Framatome filter
- MGPI (Mirion Technologies) (1) Apply MGPI (Mirion Technologies) filter
- Nukem (1) Apply Nukem filter
- RRCKI ( Russian Research Centre Kurchatov Institute) (1) Apply RRCKI ( Russian Research Centre Kurchatov Institute) filter
- TUV NORD (1) Apply TUV NORD filter
- Varta (1) Apply Varta filter
Contract information field: Sector
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
- (-) Remove Rosenergoatom filter Rosenergoatom (13)
Contract information field: Meta geographical zone
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Balakovo filter Balakovo (6)
- (-) Remove Kola filter Kola (6)
- (-) Remove Leningrad (Sosnovy Bor) filter Leningrad (Sosnovy Bor) (1)
- (-) Remove Bilibino filter Bilibino (0)
- Kalinin (12) Apply Kalinin filter
- Novovoronezh (4) Apply Novovoronezh filter
- Beloyarsk (2) Apply Beloyarsk filter
- Smolensk (2) Apply Smolensk filter
Contract information field: Nature
Contract information field: Method of procurement
Background
Objective
Background
The aim of the on-site assistance (OSA) Large scale project for Kola NPP was to maintain a strong EU engagement in order to support the country efforts to deal with problems inherited from the past in the context of on-going budget difficulties.
Background
The TACIS programmes for Nuclear Safety agreed upon between the European Commission and the relevant authorities of beneficiary states contained provisions for on-site assistance (OSA).
Background
TACIS programmes for Nuclear Safety agreed upon between the European Commission and the relevant beneficiaries of those states, contained provisions for on-site assistance.
Objective
The subject of this project is the supply to Kola NPP of a burner system for the radwaste incinerator plant. The burner system will be used for heating up the incinerator and afterwards to control the burning process.
Background
Steam flow meters originally installed on the main steam lines are not reliable, and their failure led to several reactor scrams in the past, because steam flow measurement is used for controlling steam generator water level.
Objective
The original SG control valves had to be replaced by modern Western valves. CIS manufactured valves of the required quality were not available. Therefore a joint venture was founded by Tchechov Works and Siemens.
Result
Objective
The aim of the project was the replacement of the existing safety valves on the steam generators on one of the 4 Units by modern safety valves. The objective included supply of equipment, related services, spare parts, auxiliary equipment and tools.
Objective
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective - lot 2
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective
The objective was to replace 430 units of accumulator cells for safety related systems, among them control systems and SCRAM system at Balakovo Nuclear Power Plant.
Result