Objective
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
- 2010 (1) Apply 2010 filter
- 2005 (3) Apply 2005 filter
- 2004 (4) Apply 2004 filter
- 2003 (5) Apply 2003 filter
- 2001 (6) Apply 2001 filter
- 2000 (3) Apply 2000 filter
- 1998 (3) Apply 1998 filter
- 1997 (4) Apply 1997 filter
- 1996 (17) Apply 1996 filter
- 1995 (8) Apply 1995 filter
- (-) Remove 1994 filter 1994 (30)
- (-) Remove 1992 filter 1992 (30)
- 1991 (8) Apply 1991 filter
Contract information field: Status
Contract information field: Contractor
- RRCKI ( Russian Research Centre Kurchatov Institute) (4) Apply RRCKI ( Russian Research Centre Kurchatov Institute) filter
- Siemens (3) Apply Siemens filter
- Bosch (2) Apply Bosch filter
- Ansaldo Energia (1) Apply Ansaldo Energia filter
- Balduf (1) Apply Balduf filter
- Belgatom (1) Apply Belgatom filter
- Bopp & Reuther (1) Apply Bopp & Reuther filter
- CIT (1) Apply CIT filter
- Delta Test (1) Apply Delta Test filter
- Elektrogorsk Research and Engineering Center on NPP Safety (1) Apply Elektrogorsk Research and Engineering Center on NPP Safety filter
- Empresarios Agrupados (1) Apply Empresarios Agrupados filter
- Enel (1) Apply Enel filter
- EWN (Energiewerke Nord) (1) Apply EWN (Energiewerke Nord) filter
- Industrial Marketing (1) Apply Industrial Marketing filter
- MGPI (Mirion Technologies) (1) Apply MGPI (Mirion Technologies) filter
- National Nuclear Corporation (1) Apply National Nuclear Corporation filter
- Protem (1) Apply Protem filter
- Riskaudit (1) Apply Riskaudit filter
- SEBIM (1) Apply SEBIM filter
- SEMPELL AG (1) Apply SEMPELL AG filter
- Taprogge (1) Apply Taprogge filter
- Technos (1) Apply Technos filter
- Telerob (1) Apply Telerob filter
- Varta (1) Apply Varta filter
Contract information field: Sector
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Balakovo filter Balakovo (17)
- (-) Remove Novovoronezh filter Novovoronezh (13)
- (-) Remove Bilibino filter Bilibino (0)
- Kalinin (33) Apply Kalinin filter
- South Ukraine (27) Apply South Ukraine filter
- Zaporozhye (20) Apply Zaporozhye filter
- Kola (12) Apply Kola filter
- Rovno (12) Apply Rovno filter
- Smolensk (11) Apply Smolensk filter
- Dukovany (10) Apply Dukovany filter
- Paks (10) Apply Paks filter
- Bohunice (7) Apply Bohunice filter
- Kozloduy (6) Apply Kozloduy filter
- Leningrad (Sosnovy Bor) (6) Apply Leningrad (Sosnovy Bor) filter
- Aktau (5) Apply Aktau filter
- Beloyarsk (5) Apply Beloyarsk filter
- Chernobyl (4) Apply Chernobyl filter
- Medzamor (2) Apply Medzamor filter
- Temelin (2) Apply Temelin filter
- Ignalina (1) Apply Ignalina filter
- Krsko (1) Apply Krsko filter
- Mochovce (1) Apply Mochovce filter
Contract information field: Nature
Contract information field: Method of procurement
Objective
Objective
The original SG control valves had to be replaced by modern Western valves. CIS manufactured valves of the required quality were not available. Therefore a joint venture was founded by Tchechov Works and Siemens.
Result
Objective
The aim of the project was the replacement of the existing safety valves on the steam generators on one of the 4 Units by modern safety valves. The objective included supply of equipment, related services, spare parts, auxiliary equipment and tools.
Objective
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective - lot 2
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective
The objective was to replace 430 units of accumulator cells for safety related systems, among them control systems and SCRAM system at Balakovo Nuclear Power Plant.
Result
Objectives
Objectives
Objectives
Background
The TACIS programmes for Nuclear Safety agreed upon between the European Commission and the relevant authorities of beneficiary states contained provisions for on-site assistance (OSA).
Background
Steam flow meters originally installed on the main steam lines are not reliable, and their failure led to several reactor scrams in the past, because steam flow measurement is used for controlling steam generator water level.
Objective
Since the Soviet Union purchased a number of valves in the West, mainly in Germany, parts for valves urgently to be replaced have been asked for by the Beneficiary to be funded in the framework of TACIS.
Objective
Objective
Objective
With this project, one Eddy Current Inspection Device for condensers and heat exchanger tubes was delivered. Included were 120 Eddy Current Probes and the related training on how to operate the equipment.
Objective
Improvement of the secondary loop water quality by avoiding corrosion of the turbine condenser tubes.
Beneficiary Organisation details
Bohunice NPP (Slovak Republic)
http://www.seas.sk
Dukovany NPP (Czech Republic)
http://www.cez.cz
Kozloduy NPP (Bulgaria)
Objective
In the existing fuel loading machines Instrumentation and Control errors in fuel positioning occurred and due to malfunction of the electronics all limiting blockings could run out of function.
Project Aims
The project objective was to issue PSA reports for Novovoronezh NPP, in particular: