1) Background
Previous SG (steam generator) safety valves experienced several design shortcomings:
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
- 2010 (1) Apply 2010 filter
- 2008 (1) Apply 2008 filter
- 2006 (4) Apply 2006 filter
- 2005 (1) Apply 2005 filter
- 2003 (2) Apply 2003 filter
- (-) Remove 2001 filter 2001 (22)
- 2000 (2) Apply 2000 filter
- 1998 (2) Apply 1998 filter
- 1997 (8) Apply 1997 filter
- (-) Remove 1996 filter 1996 (22)
- 1995 (11) Apply 1995 filter
- 1994 (14) Apply 1994 filter
- 1992 (15) Apply 1992 filter
- 1991 (1) Apply 1991 filter
Contract information field: Status
Contract information field: Contractor
- EDF (Electricite de France) (4) Apply EDF (Electricite de France) filter
- Data Systems & Solutions (2) Apply Data Systems & Solutions filter
- RRCKI ( Russian Research Centre Kurchatov Institute) (2) Apply RRCKI ( Russian Research Centre Kurchatov Institute) filter
- SEMPELL AG (2) Apply SEMPELL AG filter
- Ansaldo Energia (1) Apply Ansaldo Energia filter
- Bopp & Reuther (1) Apply Bopp & Reuther filter
- Diakont (1) Apply Diakont filter
- Framatome (1) Apply Framatome filter
- Lisega (1) Apply Lisega filter
- MGPI (Mirion Technologies) (1) Apply MGPI (Mirion Technologies) filter
- OKBM Mechanical Engineering (1) Apply OKBM Mechanical Engineering filter
- Rados (1) Apply Rados filter
- RE (Rheinisch-Westfälisches Elektrizitätswerk) (1) Apply RE (Rheinisch-Westfälisches Elektrizitätswerk) filter
- Riskaudit (1) Apply Riskaudit filter
- SEBIM (1) Apply SEBIM filter
- Weir Valves & Controls (1) Apply Weir Valves & Controls filter
Contract information field: Sector
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
Contract information field: Meta geographical zone
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Balakovo filter Balakovo (12)
- (-) Remove Rovno filter Rovno (10)
- (-) Remove Bilibino filter Bilibino (0)
- Kalinin (11) Apply Kalinin filter
- Medzamor (11) Apply Medzamor filter
- Novovoronezh (11) Apply Novovoronezh filter
- South Ukraine (11) Apply South Ukraine filter
- Zaporozhye (11) Apply Zaporozhye filter
- Chernobyl (6) Apply Chernobyl filter
- Kozloduy (6) Apply Kozloduy filter
- Khmelnitsky (5) Apply Khmelnitsky filter
- Ignalina (4) Apply Ignalina filter
- Kola (3) Apply Kola filter
- Leningrad (Sosnovy Bor) (3) Apply Leningrad (Sosnovy Bor) filter
- Aktau (2) Apply Aktau filter
- Beloyarsk (2) Apply Beloyarsk filter
- Smolensk (2) Apply Smolensk filter
- Baldone (1) Apply Baldone filter
- Cernavoda (1) Apply Cernavoda filter
- Dukovany (1) Apply Dukovany filter
- Krsko (1) Apply Krsko filter
- Pűspőkszilágy Radioactive Waste Facility (1) Apply Pűspőkszilágy Radioactive Waste Facility filter
- Paks (1) Apply Paks filter
- Salaspils Research Reactor (1) Apply Salaspils Research Reactor filter
Contract information field: Nature
Contract information field: Method of procurement
Beneficiary Organisation: Energoatom - NAEK (beneficiary) and Rovno NPP (end user)
1) Background
Beneficiary organisation: Energoatom, Ukraine
1) Background
Rovno NPP unit 3 is equipped with some foreign made piston shock absorbers. Due to difficult economic conditions, it was difficult to Rovno NPP to procure relevant spare parts and to implement adequate maintenance.
Background
The TACIS programmes for Nuclear Safety agreed upon between the European Commission and the relevant authorities of beneficiary states contained provisions for on-site assistance (OSA).
Objectives
Objective
This project consists of replacement of the current 2 (two) booster pumps for the feed water pumps in one Balakovo NPP.
Result
This project was combined with project R1.02/95G and jointly tendered, contracted and supplied.
Objectives
The project aimed to the modernization of the Fuel Loading Machine (FLM) at Balakovo NPP, in order to meet the machine availability and in compliance with the operation requirements of the NPP.
Objective
Objectives
1) Background
Background
Rovno NPP located in Kuznetsovsk, Rivne Region, Ukraine comprised 4 power units thereof 2 VVER440 type reactors and 2 VVER1000 type reactors.
Background
Due to a backlog of several Tacis equipment supply projects for Balakovo NPP, caused by external factors, there was an urgent need to make provisions for the proper follow-up of these projects.
Objectives
The present TACIS project U1.01/95C aims at replacing the 12 SG (steam generator) safety valves (2 per SG) of each unit 1 and unit 2 of Rovno NPP. The new safety valves should have the following functions:
Objectives
The present TACIS project U1.01/96C aims at providing spare parts for valves for unit 3 pressuriser and pressure accumulators, which were originally supplied by German companies Sempell and Bopp & Reuther.
Background
Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 96 with the same Western and Eastern Utilities and NPPs.
1) Background
Objective
Background
The primary overpressure protection system is designed to protect the reactor equipment and pipelines against primary circuit overpressure phenomena during different transients.
Background
Rovno NPP located in Kuznetsovsk, Rivne Region, Ukraine comprised 4 power units thereof 2 VVER440 type reactors and 2 VVER1000 type reactors.