1) Background
As economical situation of Ukrainian NPPs was very difficult in the early 80’s, there was an urgent need for spare parts in order to allow operation of Ukrainian NPPs.
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
- (-) Remove SEMPELL AG filter SEMPELL AG (9)
- (-) Remove Bopp & Reuther filter Bopp & Reuther (6)
- EDF (Electricite de France) (11) Apply EDF (Electricite de France) filter
- VHB Germany (7) Apply VHB Germany filter
- RE (Rheinisch-Westfälisches Elektrizitätswerk) (6) Apply RE (Rheinisch-Westfälisches Elektrizitätswerk) filter
- Siemens (5) Apply Siemens filter
- Framatome (4) Apply Framatome filter
- INKLA (4) Apply INKLA filter
- Lisega (4) Apply Lisega filter
- RRCKI ( Russian Research Centre Kurchatov Institute) (4) Apply RRCKI ( Russian Research Centre Kurchatov Institute) filter
- svt Brandschutz (4) Apply svt Brandschutz filter
- EnBW Kernkraft (3) Apply EnBW Kernkraft filter
- Herion (3) Apply Herion filter
- IBL (3) Apply IBL filter
- Persta (3) Apply Persta filter
- Riskaudit (3) Apply Riskaudit filter
- Werner Riester (3) Apply Werner Riester filter
- Babcock Sempell (2) Apply Babcock Sempell filter
- EFCO (2) Apply EFCO filter
- Intercontrole (2) Apply Intercontrole filter
- SEBIM (2) Apply SEBIM filter
- Weir Valves & Controls (2) Apply Weir Valves & Controls filter
- Albrich (1) Apply Albrich filter
- Alstom (1) Apply Alstom filter
- APC DISTRIBUTION LIMITED (1) Apply APC DISTRIBUTION LIMITED filter
- ARAKO (1) Apply ARAKO filter
- Areva (1) Apply Areva filter
- Atommashexport (1) Apply Atommashexport filter
- Bankomzvjazok (1) Apply Bankomzvjazok filter
- BMS Consulting (1) Apply BMS Consulting filter
- Brühl&Kjaer (1) Apply Brühl&Kjaer filter
- Burklin (1) Apply Burklin filter
- Degrau (1) Apply Degrau filter
- Deugro (1) Apply Deugro filter
- Diakont (1) Apply Diakont filter
- DRC International (1) Apply DRC International filter
- ENVINET (1) Apply ENVINET filter
- Friatec (1) Apply Friatec filter
- Geholit (1) Apply Geholit filter
- Hauerwas (1) Apply Hauerwas filter
- HK (Hahn & Kolb) (1) Apply HK (Hahn & Kolb) filter
- Iberdrola (1) Apply Iberdrola filter
- Limitorque (1) Apply Limitorque filter
- Nukem (1) Apply Nukem filter
- Onet Technologies (1) Apply Onet Technologies filter
- Radiy (1) Apply Radiy filter
- Rados (1) Apply Rados filter
- Schneider Electric (1) Apply Schneider Electric filter
- SOGIN (Societa Gestione Impianti Nucleari) (1) Apply SOGIN (Societa Gestione Impianti Nucleari) filter
- Syseca (1) Apply Syseca filter
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Zaporozhye filter Zaporozhye (12)
- (-) Remove Rovno filter Rovno (3)
- (-) Remove Bilibino filter Bilibino (0)
- South Ukraine (10) Apply South Ukraine filter
- Balakovo (3) Apply Balakovo filter
- Beloyarsk (1) Apply Beloyarsk filter
- Medzamor (1) Apply Medzamor filter
- Novovoronezh (1) Apply Novovoronezh filter
Contract information field: Nature
Contract information field: Method of procurement
1) Background
As economical situation of Ukrainian NPPs was very difficult in the early 80’s, there was an urgent need for spare parts in order to allow operation of Ukrainian NPPs.
Beneficiary organisation: Energoatom, Ukraine
1) Background
As economical situation of Ukrainian NPPs was very difficult in the early 90’, there was an urgent need for spare parts in order to allow their operation.
1) Background
As economical situation of Ukrainian NPPs was very difficult in the early 90’, there was an urgent need for spare parts in order to allow their operation.
Objectives
Objectives
Objectives
Objectives
Beneficiary Organisation: Energoatom
1) Background
Objectives
In the framework of the Tacis Nuclear Safety Programme, it was decided to increase the nuclear safety of the units 1 through 6 at the Zaporozhye NPP by improving the protection of the primary circuit from overpressure under normal and emergency modes.
Objectives
The present TACIS project U1.01/95C aims at replacing the 12 SG (steam generator) safety valves (2 per SG) of each unit 1 and unit 2 of Rovno NPP. The new safety valves should have the following functions:
Objectives
The present TACIS project U1.01/96C aims at providing spare parts for valves for unit 3 pressuriser and pressure accumulators, which were originally supplied by German companies Sempell and Bopp & Reuther.
Background
Project Description
After the "Stuck-open of the pressurizer safety valve" incident that occurred in Zaporozhye in 1995, the maintenance work was incriminated and led to a modification of the geometry of valve seat and disk.
Project Description
After the "Stuck-open of the pressurizer safety valve" incident that occurred in Zaporozhye in 1995, the maintenance work was incriminated and led to a modification of the geometry of valve seat and disk.
Objectives
In the framework of the “Tacis Nuclear Safety Programme”, it was decided to increase the nuclear safety of the units 1 through 6 at the Zaporozhye NPP by improving the protection of the primary circuit from overpressure under normal and emergency modes.