Background / Objective
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
- 2007 (1) Apply 2007 filter
- 2004 (6) Apply 2004 filter
- 2003 (5) Apply 2003 filter
- 2000 (1) Apply 2000 filter
- 1999 (1) Apply 1999 filter
- 1997 (2) Apply 1997 filter
- 1996 (3) Apply 1996 filter
- (-) Remove 1995 filter 1995 (6)
- 1994 (7) Apply 1994 filter
- 1993 (3) Apply 1993 filter
- (-) Remove 1992 filter 1992 (6)
- 1991 (3) Apply 1991 filter
Contract information field: Status
- (-) Remove Closed filter Closed (6)
Contract information field: Contractor
- EDF (Electricite de France) (2) Apply EDF (Electricite de France) filter
- CIT (1) Apply CIT filter
- KLE (Kernkraftwerke Lippe-Ems) (1) Apply KLE (Kernkraftwerke Lippe-Ems) filter
- National Nuclear Corporation (1) Apply National Nuclear Corporation filter
- Schneider Electric (1) Apply Schneider Electric filter
Contract information field: Sector
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Kola filter Kola (5)
- (-) Remove Bilibino filter Bilibino (1)
- South Ukraine (33) Apply South Ukraine filter
- Kalinin (24) Apply Kalinin filter
- Zaporozhye (18) Apply Zaporozhye filter
- Balakovo (13) Apply Balakovo filter
- Rovno (11) Apply Rovno filter
- Smolensk (9) Apply Smolensk filter
- Leningrad (Sosnovy Bor) (8) Apply Leningrad (Sosnovy Bor) filter
- Aktau (6) Apply Aktau filter
- Beloyarsk (6) Apply Beloyarsk filter
- Novovoronezh (2) Apply Novovoronezh filter
- Chernobyl (1) Apply Chernobyl filter
Contract information field: Nature
Contract information field: Method of procurement
Objective
The overall project aimed to develop and deliver simulation tools to be installed on the VVER-440-NPP sites (230/213). Multifunctional Simulators (MFS) had to be supplied and delivered to Novoronezh Training Centre and Kola NPP.
Objective R1.01/93
This On-Site-Assistance, in short “OSA”, project deals with the increase of the safety culture on the NPP. As in all other cases the OSA was performed by an EU utility, working with a team of Western and Russian experts.
Objective
Objective
The objective of the project was to implement the on-site assistance (OSA) at Kola NPP by a Western Consultant. This assistance by the Consultant was the subject of a formal contract between EC and the Consultant.
Result
Objective
The objective of this project was to prepare the basic design for the modernization of the Reactor Protection System on Units 3 and 4.
Result