1) Background
The IAEA identified through the comprehensive safety assessment of VVER-1000 reactors that the existing DC supply, in particular batteries to be a safety issue because of the following:
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
- 2007 (2) Apply 2007 filter
- 2006 (2) Apply 2006 filter
- 2005 (1) Apply 2005 filter
- (-) Remove 2003 filter 2003 (12)
- (-) Remove 2002 filter 2002 (12)
- 2001 (2) Apply 2001 filter
- 2000 (1) Apply 2000 filter
- 1999 (2) Apply 1999 filter
- 1998 (2) Apply 1998 filter
- (-) Remove 1997 filter 1997 (12)
- 1996 (14) Apply 1996 filter
- 1995 (6) Apply 1995 filter
- 1994 (15) Apply 1994 filter
- 1993 (3) Apply 1993 filter
- 1992 (18) Apply 1992 filter
Contract information field: Status
Contract information field: Contractor
- Iberdrola (2) Apply Iberdrola filter
- Suez Tractebel (2) Apply Suez Tractebel filter
- Diakont (1) Apply Diakont filter
- Diaprom (1) Apply Diaprom filter
- Dtn (Desarrollo Tecnologico Nuclear) (1) Apply Dtn (Desarrollo Tecnologico Nuclear) filter
- Mitsui Babcock (1) Apply Mitsui Babcock filter
- Parcol (1) Apply Parcol filter
- Riskaudit (1) Apply Riskaudit filter
- Tecnatom (1) Apply Tecnatom filter
- VHB Germany (1) Apply VHB Germany filter
Contract information field: Sector
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Kalinin filter Kalinin (6)
- (-) Remove Khmelnitsky filter Khmelnitsky (6)
- Zaporozhye (18) Apply Zaporozhye filter
- Dukovany (10) Apply Dukovany filter
- Beloyarsk (8) Apply Beloyarsk filter
- South Ukraine (8) Apply South Ukraine filter
- Kola (6) Apply Kola filter
- Smolensk (6) Apply Smolensk filter
- Medzamor (5) Apply Medzamor filter
- Rovno (5) Apply Rovno filter
- Balakovo (4) Apply Balakovo filter
- Bohunice (4) Apply Bohunice filter
- Novovoronezh (4) Apply Novovoronezh filter
- Paks (4) Apply Paks filter
- Temelin (4) Apply Temelin filter
- Chernobyl (3) Apply Chernobyl filter
- Ignalina (3) Apply Ignalina filter
- Aktau (2) Apply Aktau filter
- MARIA Research Reactor (2) Apply MARIA Research Reactor filter
- Baita Bihor (1) Apply Baita Bihor filter
- Bilibino (1) Apply Bilibino filter
- Institute of Isotope and Surface Chemistry (1) Apply Institute of Isotope and Surface Chemistry filter
- Kozloduy (1) Apply Kozloduy filter
- Leningrad (Sosnovy Bor) (1) Apply Leningrad (Sosnovy Bor) filter
- LILW repository (1) Apply LILW repository filter
- Maisiagala Repository (1) Apply Maisiagala Repository filter
- Novi Han Repository (1) Apply Novi Han Repository filter
Contract information field: Nature
Contract information field: Method of procurement
Background
Background
Background
The feedwater control valves ensured, together with the variable speed feedwater pumps, the control of the feedwater flow to - and of the level in - the Steam Generators (SG’s).
Objectives
UK/TS/31 was a 2+2 project, for support to the nuclear safety regulator of Ukraine (SNRCU) in the assessment of EU financed safety improvements within industrial project U1.04/03 "Upgrading of electrical equipment of reactor control and protection system and neutron flux monitoring equipment on K
Background
Background
1) Background
This project dealt with TACIS OSA (On-Site Assistance) at Khmelnitsky NPP.
1) Background
This contract covers the standard OSA type support to a nuclear plant in Ukraine, in the framework of the TACIS project system. It covered the years 1998 (partially) – 2003.
Objective
1. Background