Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Aktau filter Aktau (6)
- (-) Remove Khmelnitsky filter Khmelnitsky (1)
- Zaporozhye (19) Apply Zaporozhye filter
- South Ukraine (18) Apply South Ukraine filter
- Balakovo (10) Apply Balakovo filter
- Medzamor (9) Apply Medzamor filter
- Kalinin (8) Apply Kalinin filter
- Novovoronezh (7) Apply Novovoronezh filter
- Beloyarsk (5) Apply Beloyarsk filter
- Rovno (5) Apply Rovno filter
- Leningrad (Sosnovy Bor) (4) Apply Leningrad (Sosnovy Bor) filter
- Smolensk (4) Apply Smolensk filter
- Kola (3) Apply Kola filter
- Bilibino (1) Apply Bilibino filter
Contract information field: Nature
Contract information field: Method of procurement
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
Objectives
Objectives
In the framework of the “Tacis Nuclear Safety Programme”, it was decided to improve the passive fire protection facilities of the BN-350 NPP (fast breeder) in Aktau, Kazakhstan. The project was divided into three lots:
1) Background