Background
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
- Alstom (2) Apply Alstom filter
- Carl Zeiss (1) Apply Carl Zeiss filter
- Data Systems & Solutions (1) Apply Data Systems & Solutions filter
- Deutsche Exide StanBy (1) Apply Deutsche Exide StanBy filter
- Esterline (1) Apply Esterline filter
- Framatome (1) Apply Framatome filter
- Inaqua (1) Apply Inaqua filter
- JSC; Elox-Prom; JSC-Schneider (1) Apply JSC; Elox-Prom; JSC-Schneider filter
- Lloyd Instruments (1) Apply Lloyd Instruments filter
- Roeii Amsier (1) Apply Roeii Amsier filter
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Aktau filter Aktau (6)
- (-) Remove Kalinin filter Kalinin (5)
- (-) Remove Khmelnitsky filter Khmelnitsky (0)
- South Ukraine (12) Apply South Ukraine filter
- Zaporozhye (9) Apply Zaporozhye filter
- Balakovo (5) Apply Balakovo filter
- Beloyarsk (4) Apply Beloyarsk filter
- Leningrad (Sosnovy Bor) (3) Apply Leningrad (Sosnovy Bor) filter
- Smolensk (3) Apply Smolensk filter
- Rovno (2) Apply Rovno filter
- Bilibino (1) Apply Bilibino filter
Contract information field: Nature
Contract information field: Method of procurement
Objective
Objective
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
Objectives
Objectives
In the framework of the “Tacis Nuclear Safety Programme”, it was decided to improve the passive fire protection facilities of the BN-350 NPP (fast breeder) in Aktau, Kazakhstan. The project was divided into three lots:
Background
The project intended to implement at Kalinin Unit 2 (VVER 1000 type) a system allowing for diagnostic and monitoring of small leaks in equipment and piping of primary coolant circuit pressure boundary located inside the reactor containment.
Tractebel, the European Commission’s On Site Assistance Consultant at Kalinin NPP, recommended the European Commission to sign a direct agreement with Auxitrol for providing 59 electrical penetrations to Kalinin NPP units 1�& 2.