1) Background
Search
Contract information field: Programme
- (-) Remove TACIS filter TACIS (15)
Contract information field: Country
Contract information field: Budget year
- 2006 (3) Apply 2006 filter
- 2005 (1) Apply 2005 filter
- 2003 (1) Apply 2003 filter
- 2002 (3) Apply 2002 filter
- 1998 (1) Apply 1998 filter
- 1997 (12) Apply 1997 filter
- 1996 (11) Apply 1996 filter
- (-) Remove 1995 filter 1995 (15)
- 1994 (14) Apply 1994 filter
- 1993 (12) Apply 1993 filter
- 1992 (9) Apply 1992 filter
Contract information field: Status
Contract information field: Contractor
- VHB Germany (3) Apply VHB Germany filter
- Alstom (2) Apply Alstom filter
- SEMPELL AG (2) Apply SEMPELL AG filter
- Bopp & Reuther (1) Apply Bopp & Reuther filter
- Carl Zeiss (1) Apply Carl Zeiss filter
- Deutsche Exide StanBy (1) Apply Deutsche Exide StanBy filter
- IBL (1) Apply IBL filter
- INKLA (1) Apply INKLA filter
- Lloyd Instruments (1) Apply Lloyd Instruments filter
- Roeii Amsier (1) Apply Roeii Amsier filter
- svt Brandschutz (1) Apply svt Brandschutz filter
Contract information field: Sector
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Zaporozhye filter Zaporozhye (9)
- (-) Remove Aktau filter Aktau (6)
- (-) Remove Khmelnitsky filter Khmelnitsky (0)
- South Ukraine (12) Apply South Ukraine filter
- Balakovo (5) Apply Balakovo filter
- Kalinin (5) Apply Kalinin filter
- Beloyarsk (4) Apply Beloyarsk filter
- Leningrad (Sosnovy Bor) (3) Apply Leningrad (Sosnovy Bor) filter
- Smolensk (3) Apply Smolensk filter
- Rovno (2) Apply Rovno filter
- Bilibino (1) Apply Bilibino filter
Contract information field: Nature
- (-) Remove Supply filter Supply (15)
Contract information field: Method of procurement
Objectives
Objectives
Objectives
Objectives
Objectives
Background
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
The objective of this project was to provide to the End User, that is the nuclear power plant BN-350 (Aktau, Kazakhstan), with several equipment for the metallurgic analysis, mainly devoted (but not limited) to destructive and non-destructive testing (NDT).
Objectives
Objectives
Objectives
In the framework of the “Tacis Nuclear Safety Programme”, it was decided to improve the passive fire protection facilities of the BN-350 NPP (fast breeder) in Aktau, Kazakhstan. The project was divided into three lots:
Project Description
After the "Stuck-open of the pressurizer safety valve" incident that occurred in Zaporozhye in 1995, the maintenance work was incriminated and led to a modification of the geometry of valve seat and disk.
Project Description
After the "Stuck-open of the pressurizer safety valve" incident that occurred in Zaporozhye in 1995, the maintenance work was incriminated and led to a modification of the geometry of valve seat and disk.