Objective
According to the intention of the European Union and the Russian Ministry of Atomic Power the operational safety assistance, which started with TACIS 92, continued with TACIS 96 with the same Western and Eastern Utilities and NPPs.
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
- 2010 (1) Apply 2010 filter
- 2009 (1) Apply 2009 filter
- 2008 (1) Apply 2008 filter
- 2007 (1) Apply 2007 filter
- 2006 (4) Apply 2006 filter
- 2005 (2) Apply 2005 filter
- 2004 (4) Apply 2004 filter
- 2003 (6) Apply 2003 filter
- 2002 (1) Apply 2002 filter
- 2001 (11) Apply 2001 filter
- 2000 (3) Apply 2000 filter
- 1999 (1) Apply 1999 filter
- 1998 (4) Apply 1998 filter
- 1997 (14) Apply 1997 filter
- (-) Remove 1996 filter 1996 (18)
- 1995 (14) Apply 1995 filter
- 1994 (20) Apply 1994 filter
- 1993 (1) Apply 1993 filter
- 1992 (20) Apply 1992 filter
- 1991 (1) Apply 1991 filter
Contract information field: Status
Contract information field: Contractor
- SEMPELL AG (2) Apply SEMPELL AG filter
- Ansaldo Energia (1) Apply Ansaldo Energia filter
- Bopp & Reuther (1) Apply Bopp & Reuther filter
- British Energy (1) Apply British Energy filter
- Brühl&Kjaer (1) Apply Brühl&Kjaer filter
- Diakont (1) Apply Diakont filter
- Dtn (Desarrollo Tecnologico Nuclear) (1) Apply Dtn (Desarrollo Tecnologico Nuclear) filter
- EDF (Electricite de France) (1) Apply EDF (Electricite de France) filter
- Framatome (1) Apply Framatome filter
- Lisega (1) Apply Lisega filter
- MGPI (Mirion Technologies) (1) Apply MGPI (Mirion Technologies) filter
- Mitsui Babcock (1) Apply Mitsui Babcock filter
- Nottingham University Industrial and Commercial Enterprise (1) Apply Nottingham University Industrial and Commercial Enterprise filter
- OKBM Mechanical Engineering (1) Apply OKBM Mechanical Engineering filter
- Rados (1) Apply Rados filter
- RRCKI ( Russian Research Centre Kurchatov Institute) (1) Apply RRCKI ( Russian Research Centre Kurchatov Institute) filter
- SEBIM (1) Apply SEBIM filter
Contract information field: Sector
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Balakovo filter Balakovo (7)
- (-) Remove Rovno filter Rovno (6)
- (-) Remove Khmelnitsky filter Khmelnitsky (3)
- (-) Remove Smolensk filter Smolensk (2)
- Kalinin (11) Apply Kalinin filter
- Medzamor (11) Apply Medzamor filter
- Zaporozhye (11) Apply Zaporozhye filter
- Novovoronezh (10) Apply Novovoronezh filter
- South Ukraine (7) Apply South Ukraine filter
- Chernobyl (5) Apply Chernobyl filter
- Kozloduy (4) Apply Kozloduy filter
- Kola (3) Apply Kola filter
- Aktau (2) Apply Aktau filter
- Beloyarsk (2) Apply Beloyarsk filter
- Leningrad (Sosnovy Bor) (2) Apply Leningrad (Sosnovy Bor) filter
Contract information field: Nature
Contract information field: Method of procurement
Objective
The project deals with general site assistance on Smolensk NPP.
1) Background
Objective
Objectives
The present TACIS project U1.01/95C aims at replacing the 12 SG (steam generator) safety valves (2 per SG) of each unit 1 and unit 2 of Rovno NPP. The new safety valves should have the following functions:
Objectives
The present TACIS project U1.01/96C aims at providing spare parts for valves for unit 3 pressuriser and pressure accumulators, which were originally supplied by German companies Sempell and Bopp & Reuther.
Background
Background
Objective
Objectives
The project aimed to the modernization of the Fuel Loading Machine (FLM) at Balakovo NPP, in order to meet the machine availability and in compliance with the operation requirements of the NPP.
1) Background
This contract covers the standard OSA type support to a nuclear plant in Ukraine, in the framework of the TACIS project system. It covered the years 1997 (partially) – 2003.
2)Objectives
Background
The TACIS programmes for Nuclear Safety agreed upon between the European Commission and the relevant authorities of beneficiary states contained provisions for on-site assistance (OSA).
Objectives
Objective
This project consists of replacement of the current 2 (two) booster pumps for the feed water pumps in one Balakovo NPP.
Result
This project was combined with project R1.02/95G and jointly tendered, contracted and supplied.
1) Background
Previous SG (steam generator) safety valves experienced several design shortcomings:
Beneficiary Organisation: Energoatom - NAEK (beneficiary) and Rovno NPP (end user)
1) Background
Beneficiary organisation: Energoatom, Ukraine
1) Background
Rovno NPP unit 3 is equipped with some foreign made piston shock absorbers. Due to difficult economic conditions, it was difficult to Rovno NPP to procure relevant spare parts and to implement adequate maintenance.
1) Background
Background