1) Background
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
- (-) Remove EDF (Electricite de France) filter EDF (Electricite de France) (7)
- (-) Remove SEBIM filter SEBIM (2)
- (-) Remove Herion filter Herion (1)
- (-) Remove Lisega filter Lisega (1)
- (-) Remove Mitsui Babcock filter Mitsui Babcock (1)
- Iberdrola (3) Apply Iberdrola filter
- Bopp & Reuther (2) Apply Bopp & Reuther filter
- Dtn (Desarrollo Tecnologico Nuclear) (2) Apply Dtn (Desarrollo Tecnologico Nuclear) filter
- Framatome (2) Apply Framatome filter
- Alstom (1) Apply Alstom filter
- Ansaldo Energia (1) Apply Ansaldo Energia filter
- Babcock Sempell (1) Apply Babcock Sempell filter
- Brühl&Kjaer (1) Apply Brühl&Kjaer filter
- ENVINET (1) Apply ENVINET filter
- Intercontrole (1) Apply Intercontrole filter
- Onet Technologies (1) Apply Onet Technologies filter
- Persta (1) Apply Persta filter
- Rados (1) Apply Rados filter
- RE (Rheinisch-Westfälisches Elektrizitätswerk) (1) Apply RE (Rheinisch-Westfälisches Elektrizitätswerk) filter
- Syseca (1) Apply Syseca filter
- VHB Germany (1) Apply VHB Germany filter
- Weir Valves & Controls (1) Apply Weir Valves & Controls filter
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
- (-) Remove EnergoAtom filter EnergoAtom (12)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
Contract information field: Nature
Contract information field: Method of procurement
Background
Rovno NPP located in Kuznetsovsk, Rivne Region, Ukraine comprised 4 power units thereof 2 VVER440 type reactors and 2 VVER1000 type reactors.
1) Background
1) Background
Continuation of TACIS OSA (On-Site Assistance) at Rovno NPP.
U1.01/98 & U1.01/98A
1) Background
1) Background
Beneficiary organisation: Energoatom, Ukraine
1) Background
Previous SG (steam generator) safety valves experienced several design shortcomings:
1) Background
Previous SG (steam generator) safety valves experienced several design shortcomings:
Beneficiary organisation: Energoatom, Ukraine
1) Background
Rovno NPP unit 3 is equipped with some foreign made piston shock absorbers. Due to difficult economic conditions, it was difficult to Rovno NPP to procure relevant spare parts and to implement adequate maintenance.
Background
1) Background
As economical situation of Ukrainian NPPs was very difficult in the early 80’s, there was an urgent need for spare parts in order to allow operation of Ukrainian NPPs.