Objectives
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
- Framatome (3) Apply Framatome filter
- Siemens (3) Apply Siemens filter
- Bosch (2) Apply Bosch filter
- Data Systems & Solutions (2) Apply Data Systems & Solutions filter
- OKBM Mechanical Engineering (2) Apply OKBM Mechanical Engineering filter
- SEMPELL AG (2) Apply SEMPELL AG filter
- VHB Germany (2) Apply VHB Germany filter
- Ansaldo Energia (1) Apply Ansaldo Energia filter
- BALTIJOS INFORMACINES SISTEMOS UAB (1) Apply BALTIJOS INFORMACINES SISTEMOS UAB filter
- Bopp & Reuther (1) Apply Bopp & Reuther filter
- Brühl&Kjaer (1) Apply Brühl&Kjaer filter
- Delta Test (1) Apply Delta Test filter
- Diakont (1) Apply Diakont filter
- Elektrogorsk Research and Engineering Center on NPP Safety (1) Apply Elektrogorsk Research and Engineering Center on NPP Safety filter
- MGPI (Mirion Technologies) (1) Apply MGPI (Mirion Technologies) filter
- MICA (1) Apply MICA filter
- Mitsui Babcock (1) Apply Mitsui Babcock filter
- SEBIM (1) Apply SEBIM filter
- Taprogge (1) Apply Taprogge filter
- Technos (1) Apply Technos filter
- Varta (1) Apply Varta filter
Contract information field: Sector
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Balakovo filter Balakovo (27)
- (-) Remove Khmelnitsky filter Khmelnitsky (4)
- (-) Remove Institute of Isotope and Surface Chemistry filter Institute of Isotope and Surface Chemistry (0)
- Zaporozhye (65) Apply Zaporozhye filter
- South Ukraine (52) Apply South Ukraine filter
- Kalinin (41) Apply Kalinin filter
- Medzamor (21) Apply Medzamor filter
- Rovno (19) Apply Rovno filter
- Novovoronezh (17) Apply Novovoronezh filter
- Beloyarsk (15) Apply Beloyarsk filter
- Kola (13) Apply Kola filter
- Smolensk (12) Apply Smolensk filter
- Aktau (10) Apply Aktau filter
- Leningrad (Sosnovy Bor) (7) Apply Leningrad (Sosnovy Bor) filter
- Bilibino (2) Apply Bilibino filter
- Chernobyl (2) Apply Chernobyl filter
- Krsko (1) Apply Krsko filter
Contract information field: Nature
Contract information field: Method of procurement
Objectives
Background
Balakovo Nuclear Power Plant has four units completed and in operation; all units are of the VVER 1000-V320 type.
Objective
Objective
Improvement of the secondary loop water quality by avoiding corrosion of the turbine condenser tubes.
Objective
With this project, one Eddy Current Inspection Device for condensers and heat exchanger tubes was delivered. Included were 120 Eddy Current Probes and the related training on how to operate the equipment.
Objective
Since the Soviet Union purchased a number of valves in the West, mainly in Germany, parts for valves urgently to be replaced have been asked for by the Beneficiary to be funded in the framework of TACIS.
Objective
Objective
Background
Steam flow meters originally installed on the main steam lines are not reliable, and their failure led to several reactor scrams in the past, because steam flow measurement is used for controlling steam generator water level.
Background
6kV circuit breakers originally installed in the units at Balakovo NPP are of the VES-6 type, and the related cabinets are of KE-6 type. Their supplier is Rovno high voltage equipment plant, Ukraine.
Introduction
Objectives
The project aimed to the modernization of the Fuel Loading Machine (FLM) at Balakovo NPP, in order to meet the machine availability and in compliance with the operation requirements of the NPP.
Background
The TACIS programmes for Nuclear Safety agreed upon between the European Commission and the relevant authorities of beneficiary states contained provisions for on-site assistance (OSA).
Objective
Objective
The original SG control valves had to be replaced by modern Western valves. CIS manufactured valves of the required quality were not available. Therefore a joint venture was founded by Tchechov Works and Siemens.
Result
Objective
The aim of the project was the replacement of the existing safety valves on the steam generators on one of the 4 Units by modern safety valves. The objective included supply of equipment, related services, spare parts, auxiliary equipment and tools.
Objective
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective - lot 2
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective
The objective was to replace 430 units of accumulator cells for safety related systems, among them control systems and SCRAM system at Balakovo Nuclear Power Plant.
Result