Project Aims
The work to be performed under this contract was aimed at preparing the co-operation with the Ukrainian NPP Zaporozhe in continuation of a previous Tacis programme implementation.
Navigation path
Project Aims
The work to be performed under this contract was aimed at preparing the co-operation with the Ukrainian NPP Zaporozhe in continuation of a previous Tacis programme implementation.
1) Background
Continuation of TACIS OSA (On-Site Assistance) at Zaporozhye NPP.
1) Background
The issue of the integrity of the cable penetrations in relation to fire was identified by the IAEA and ranked level 3. Moreover, the ZNPP received in 1995 a licence conditions for operation from SNRC.
1) Background
The IAEA identified through the comprehensive safety assessment of VVER-1000 reactors that the existing DC supply, in particular batteries to be a safety issue because of the following:
Background
Objectives
Objectives
Objectives
Objectives
Objectives
Objectives
Objectives