Objectives
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
- Framatome (3) Apply Framatome filter
- Siemens (3) Apply Siemens filter
- Bosch (2) Apply Bosch filter
- Data Systems & Solutions (2) Apply Data Systems & Solutions filter
- Fortum (2) Apply Fortum filter
- OKBM Mechanical Engineering (2) Apply OKBM Mechanical Engineering filter
- SGN (Societe generale pour les techniques nouvelles) (2) Apply SGN (Societe generale pour les techniques nouvelles) filter
- BALTIJOS INFORMACINES SISTEMOS UAB (1) Apply BALTIJOS INFORMACINES SISTEMOS UAB filter
- Diakont (1) Apply Diakont filter
- Elektrogorsk Research and Engineering Center on NPP Safety (1) Apply Elektrogorsk Research and Engineering Center on NPP Safety filter
- Marex Technology (1) Apply Marex Technology filter
- MICA (1) Apply MICA filter
- SEBIM (1) Apply SEBIM filter
- SEMPELL AG (1) Apply SEMPELL AG filter
- Varta (1) Apply Varta filter
- VHB Germany (1) Apply VHB Germany filter
Contract information field: Sector
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
- (-) Remove Rosenergoatom filter Rosenergoatom (25)
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
- (-) Remove Balakovo filter Balakovo (19)
- (-) Remove Leningrad (Sosnovy Bor) filter Leningrad (Sosnovy Bor) (6)
- Kalinin (37) Apply Kalinin filter
- Beloyarsk (15) Apply Beloyarsk filter
- Novovoronezh (15) Apply Novovoronezh filter
- Kola (14) Apply Kola filter
- Smolensk (11) Apply Smolensk filter
- Bilibino (2) Apply Bilibino filter
Contract information field: Nature
Contract information field: Method of procurement
Objectives
Objective
Background
Balakovo Nuclear Power Plant has four units completed and in operation; all units are of the VVER 1000-V320 type.
Objective
Objective
Background
Steam flow meters originally installed on the main steam lines are not reliable, and their failure led to several reactor scrams in the past, because steam flow measurement is used for controlling steam generator water level.
Introduction
Background
Objectives
The project aimed to the modernization of the Fuel Loading Machine (FLM) at Balakovo NPP, in order to meet the machine availability and in compliance with the operation requirements of the NPP.
Objective
The original SG control valves had to be replaced by modern Western valves. CIS manufactured valves of the required quality were not available. Therefore a joint venture was founded by Tchechov Works and Siemens.
Result
Objective
The aim of the project was the replacement of the existing safety valves on the steam generators on one of the 4 Units by modern safety valves. The objective included supply of equipment, related services, spare parts, auxiliary equipment and tools.
Objective
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective - lot 2
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective
The objective was to replace 430 units of accumulator cells for safety related systems, among them control systems and SCRAM system at Balakovo Nuclear Power Plant.
Result
Objectives
Two prototypes of ECCS-pump (Emergency Core Cooling System) intake filters were designed, supplied and installed in the framework of this project, including the budget of project R1.02/96C.
Objectives
Objective
Objectives
Objective
The project includes procurement of special maintenance equipment for large scale repair and replacement of heavy components like steam generators, pipes and valves.
The envisaged tools and equipment include: