Objectives
The present TACIS project U1.01/96C aims at providing spare parts for valves for unit 3 pressuriser and pressure accumulators, which were originally supplied by German companies Sempell and Bopp & Reuther.
Background
Navigation path
Objectives
The present TACIS project U1.01/96C aims at providing spare parts for valves for unit 3 pressuriser and pressure accumulators, which were originally supplied by German companies Sempell and Bopp & Reuther.
Background
1) Background
Continuation of TACIS OSA (On-Site Assistance) at Rovno NPP.
1) Background
Continuation of TACIS OSA (On-Site Assistance) at Rovno NPP.
1) Background
This project is the continuation of TACIS OSA (On-Site Assistance) at South Ukraine NPP(see U1.02/96).
1) Background
Continuation of TACIS OSA (On-Site Assistance) at South Ukraine NPP.
1) Background
This contract is for the the design, manufacture, delivery, etc.
1) Background
Beneficiary Organisation: Energoatom/End user SUK NPP
Project Description (to be included in the Database)
The aims of the On-Site Assistance at the RNPP have been:
1. to improve operational safety culture of the RNPP (Soft OSA) through general On-Site Assistance to RNPP eg.
U1.01/95 - Phase 3
Background
Background
Background
Background
The primary overpressure protection system is designed to protect the reactor equipment and pipelines against primary circuit overpressure phenomena during different transients.
Background
Rovno NPP located in Kuznetsovsk, Rivne Region, Ukraine comprised 4 power units thereof 2 VVER440 type reactors and 2 VVER1000 type reactors.
1)Background
1)Background
1)Background
1) Background