Objective
The objective of the project was to implement the on-site assistance (OSA) at Kola NPP by a Western Consultant. This assistance by the Consultant was the subject of a formal contract between EC and the Consultant.
Result
Navigation path
Objective
The objective of the project was to implement the on-site assistance (OSA) at Kola NPP by a Western Consultant. This assistance by the Consultant was the subject of a formal contract between EC and the Consultant.
Result
Objective
The objective of this project was to prepare the basic design for the modernization of the Reactor Protection System on Units 3 and 4.
Result
Beneficiary Organization Details
Kozloduy NPP
http://www.kznpp.org
Project Aims
Beneficiary Organization Details
Kozloduy NPP (Bulgaria)
http://www.kznpp.org
Project Aims
Beneficiary Ornganisation Details
Kozloduy NPP:
http://www.kznpp.org/
Project Aims
Summary
Summary
The contract between NEK and EDF is an extension of the previous ones between the Energy Committee of Bulgaria and EDF.
Its objective is to improve the operation safety level of the KOZLODUY NPP power units.
Summary
The work of EDF encompassed one main field of activity: an on-request engineering support according to the needs expressed by Kozloduy NPP (KNPP).
The following activities took place within the project: