Objective
The objective of this project is:
Navigation path
Objective
The objective of this project is:
1) Background
Background
The TACIS programmes for Nuclear Safety agreed upon between the European Commission and the relevant authorities of beneficiary states contained provisions for on-site assistance (OSA).
Objectives
Objective
The project deals with general site assistance on Smolensk NPP.
Introduction
Objective
Objectives
Brief Project History
Objective
1) Background
Objectives
The project aimed to the modernization of the Fuel Loading Machine (FLM) at Balakovo NPP, in order to meet the machine availability and in compliance with the operation requirements of the NPP.
Objectives
Objective
This project consists of replacement of the current 2 (two) booster pumps for the feed water pumps in one Balakovo NPP.
Result
This project was combined with project R1.02/95G and jointly tendered, contracted and supplied.
Background
Objective
This present project shall complete the work initiated under R1.03/94E and R1.03/95A.
In the frame of this project, the following tasks are to be performed:
Background
The TACIS 91 Project 4.2 “Crisis Management and Safety Panels” constituted the first phase of a global project aimed at providing a complete crisis management system to improve nuclear safety in Russian VVER 1000 nuclear power plants.
Background
Objective
The aim of the project is the refurbishment of the present Process Monitoring System (PMS) with full consideration of the possibility to operate with PMS functions in the present as well as in the new system.
Background