Background
Search
Contract information field: Programme
- (-) Remove TACIS filter TACIS (50)
Contract information field: Country
Contract information field: Budget year
- 2005 (1) Apply 2005 filter
- 2004 (6) Apply 2004 filter
- 2003 (13) Apply 2003 filter
- 2002 (5) Apply 2002 filter
- 2001 (4) Apply 2001 filter
- 2000 (5) Apply 2000 filter
- 1999 (2) Apply 1999 filter
- 1998 (8) Apply 1998 filter
- 1997 (16) Apply 1997 filter
- 1996 (21) Apply 1996 filter
- 1995 (30) Apply 1995 filter
- (-) Remove 1994 filter 1994 (50)
- 1993 (12) Apply 1993 filter
- 1992 (30) Apply 1992 filter
- 1991 (19) Apply 1991 filter
Contract information field: Status
Contract information field: Contractor
- SEBIM (4) Apply SEBIM filter
- Framatome (3) Apply Framatome filter
- MGPI (Mirion Technologies) (3) Apply MGPI (Mirion Technologies) filter
- RRCKI ( Russian Research Centre Kurchatov Institute) (3) Apply RRCKI ( Russian Research Centre Kurchatov Institute) filter
- Belgatom (2) Apply Belgatom filter
- Bosch (2) Apply Bosch filter
- British Energy (2) Apply British Energy filter
- Magnox Electric (2) Apply Magnox Electric filter
- Siemens (2) Apply Siemens filter
- Ansaldo Energia (1) Apply Ansaldo Energia filter
- Areva (1) Apply Areva filter
- BERRY (1) Apply BERRY filter
- Brühl&Kjaer (1) Apply Brühl&Kjaer filter
- CITA (1) Apply CITA filter
- Cotecna (1) Apply Cotecna filter
- DataLoop (1) Apply DataLoop filter
- EFCO (1) Apply EFCO filter
- Elektrogorsk Research and Engineering Center on NPP Safety (1) Apply Elektrogorsk Research and Engineering Center on NPP Safety filter
- EWN (Energiewerke Nord) (1) Apply EWN (Energiewerke Nord) filter
- Gea Wenutec (1) Apply Gea Wenutec filter
- IBS (1) Apply IBS filter
- Industrial Marketing (1) Apply Industrial Marketing filter
- Kraftanlagen (1) Apply Kraftanlagen filter
- Lamport (1) Apply Lamport filter
- Mitsui Babcock (1) Apply Mitsui Babcock filter
- Nukem (1) Apply Nukem filter
- Protem (1) Apply Protem filter
- Schneider Electric (1) Apply Schneider Electric filter
- Seres (1) Apply Seres filter
- SGN (Societe generale pour les techniques nouvelles) (1) Apply SGN (Societe generale pour les techniques nouvelles) filter
- Taprogge (1) Apply Taprogge filter
- Telerob (1) Apply Telerob filter
- THERMATOME (1) Apply THERMATOME filter
- TUV NORD (1) Apply TUV NORD filter
- Varta (1) Apply Varta filter
- Waters (1) Apply Waters filter
Contract information field: Sector
Contract information field: Types of activities
- Equipment Supply (32) Apply Equipment Supply filter
- On Site Assistance (7) Apply On Site Assistance filter
- Design safety (6) Apply Design safety filter
- Mitigation of Chernobyl accident (1) Apply Mitigation of Chernobyl accident filter
- RBMK studies (1) Apply RBMK studies filter
- Studies (1) Apply Studies filter
- Training (1) Apply Training filter
Contract information field: Partner (Beneficiary)
- (-) Remove Rosenergoatom filter Rosenergoatom (49)
- (-) Remove Ministry of Emergencies of Ukraine filter Ministry of Emergencies of Ukraine (1)
- EnergoAtom (20) Apply EnergoAtom filter
- MINATOM RF, later ROSATOM (since 12/2007) (7) Apply MINATOM RF, later ROSATOM (since 12/2007) filter
- GOSKOMATOM (4) Apply GOSKOMATOM filter
- Rostechnadzor (4) Apply Rostechnadzor filter
- Chernobyl NPP (3) Apply Chernobyl NPP filter
- Armenian Nuclear Power Plant (2) Apply Armenian Nuclear Power Plant filter
- Government of Ukraine (2) Apply Government of Ukraine filter
- Kiev Institute Energoproject (1) Apply Kiev Institute Energoproject filter
- Nuclear Regulatory Administration (NRA) of Ukraine (1) Apply Nuclear Regulatory Administration (NRA) of Ukraine filter
- Sevastopol Institute of Nuclear Energy and Industry (SINEI) (1) Apply Sevastopol Institute of Nuclear Energy and Industry (SINEI) filter
Contract information field: Meta geographical zone
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
Contract information field: Nature
Contract information field: Method of procurement
Background
Objective
Objectives
Kalinin Secondary water chemistry
Objective
The water quality on Kalinin Unit 2 has similar shortcomings as in Unit 1. The successful approach which was applied in project R1.03/92A for Kalinin Unit 1 shall be extended on Unit 2.
Kalinin Make up water preparation (I)
Objective
The water quality on Kalinin Unit 2 has similar shortcomings as in Unit 1. The successful approach which was applied in project R1.03/92A for Kalinin Unit 1 shall be extended on Unit 2.
Kalinin Make up water preparation (II)
Objective
The water quality on Kalinin Unit 2 has similar shortcomings as in Unit 1. The successful approach which was applied in project R1.03/92A for Kalinin Unit 1 shall be extended on Unit 2.
Objective
A general assessment was to be performed on how to improve the medium voltage supply at Kalinin. The assessment should cover medium voltage distribution associated with automation, supervision and cabling.
Deliverables of the assessment:
Background
Objective
The purpose of this project is the continuation and finalization of work commenced with Tacis Project R 3.5/91.
Objective
The purpose of this project is the continuation and finalization of work commenced with Tacis Project R 3.5/91.
Objective
Objective
Objective
Objective
Objective
The original SG control valves had to be replaced by modern Western valves. CIS manufactured valves of the required quality were not available. Therefore a joint venture was founded by Tchechov Works and Siemens.
Result
Objective
The aim of the project was the replacement of the existing safety valves on the steam generators on one of the 4 Units by modern safety valves. The objective included supply of equipment, related services, spare parts, auxiliary equipment and tools.
Objective
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective - lot 2
The present signalisation was considered unreliable. The sensors did not work properly and have led to the unintentional start of the fire fighting system.
The project covers the supply of the following equipment:
Objective
The objective was to replace 430 units of accumulator cells for safety related systems, among them control systems and SCRAM system at Balakovo Nuclear Power Plant.
Result