1) Background
The OSA contract to this project bridged the time to continue without interruption the On-Site-Activity of the Western Utility RWE.
Navigation path
1) Background
The OSA contract to this project bridged the time to continue without interruption the On-Site-Activity of the Western Utility RWE.
Project BE/RA/02 is a follow-up of project BE/RA/01 with almost the same objectives. The assistance in the field of emergency preparedness including planning and training was included as new objective. This project has 6 technical tasks.
Project Aims
The work to be performed under this contract was aimed at preparing the co-operation with the Ukrainian NPP Zaporozhe in continuation of a previous Tacis programme implementation.
1) Background
Continuation of TACIS OSA (On-Site Assistance) at Zaporozhye NPP.
1) Background
This contract is for the the design, manufacture, delivery, etc.