1) Background
The OSA contract to this project bridged the time to continue without interruption the On-Site-Activity of the Western Utility RWE.
Navigation path
1) Background
The OSA contract to this project bridged the time to continue without interruption the On-Site-Activity of the Western Utility RWE.
Project BE/RA/02 is a follow-up of project BE/RA/01 with almost the same objectives. The assistance in the field of emergency preparedness including planning and training was included as new objective. This project has 6 technical tasks.
1) Background
1) Background
1) Background
Background
Objectives
Background
Project Aims
The work to be performed under this contract was aimed at preparing the co-operation with the Ukrainian NPP Zaporozhe in continuation of a previous Tacis programme implementation.
Background
1) Background
Continuation of TACIS OSA (On-Site Assistance) at Zaporozhye NPP.
1) Background
Background
1) Background
This project is the continuation of TACIS OSA (On-Site Assistance) at South Ukraine NPP (see U1.02/97).
1) Background
Continuation of TACIS OSA (On-Site Assistance) at Khmelnitsky NPP.
U1.01/98 & U1.01/98A
1) Background
Objectives
The present TACIS project U1.01/95C aims at replacing the 12 SG (steam generator) safety valves (2 per SG) of each unit 1 and unit 2 of Rovno NPP. The new safety valves should have the following functions:
1) Background
Continuation of TACIS OSA (On-Site Assistance) at Rovno NPP.
1) Background
This project is the continuation of TACIS OSA (On-Site Assistance) at South Ukraine NPP(see U1.02/96).