Objective
This project consists of replacement of the current 2 (two) booster pumps for the feed water pumps in one Balakovo NPP.
Result
This project was combined with project R1.02/95G and jointly tendered, contracted and supplied.
Navigation path
Objective
This project consists of replacement of the current 2 (two) booster pumps for the feed water pumps in one Balakovo NPP.
Result
This project was combined with project R1.02/95G and jointly tendered, contracted and supplied.
Objectives
Objectives
Objectives
Objective
In the framework of the TACIS 1992 programme, the Commission agreed with the Russian authorities on technical assistance projects to be financed by the European Community in the field of nuclear safety.
Background
The overall goal of the project was to improve the existing systems and methods for in-service diagnostic of corrosion condition of secondary circuit equipment and to elaborate computer calculation codes for resource estimation in the following areas:
Background
The overall goal of the project was to improve the existing systems and methods for in-service diagnostic of corrosion condition of secondary circuit equipment and to elaborate computer calculation codes for resource estimation in the following areas:
Objective
Background
The TACIS programmes for Nuclear Safety agreed upon between the European Commission and the relevant authorities of beneficiary states contained provisions for on-site assistance (OSA).
Objective
Project Description
Objective
The objective was to deliver the following items:
Background
The project intended to implement at Kalinin Unit 2 (VVER 1000 type) a system allowing for diagnostic and monitoring of small leaks in equipment and piping of primary coolant circuit pressure boundary located inside the reactor containment.
Background
Steam flow meters originally installed on the main steam lines are not reliable, and their failure led to several reactor scrams in the past, because steam flow measurement is used for controlling steam generator water level.
Introduction
Background
Objectives
The project aimed to the modernization of the Fuel Loading Machine (FLM) at Balakovo NPP, in order to meet the machine availability and in compliance with the operation requirements of the NPP.
Background
The TACIS programmes for Nuclear Safety agreed upon between the European Commission and the relevant authorities of beneficiary states contained provisions for on-site assistance (OSA).
Background
TACIS programmes for Nuclear Safety agreed upon between the European Commission and the relevant beneficiaries of those states, contained provisions for on-site assistance.
Objective
The subject of this project is the supply to Kola NPP of a burner system for the radwaste incinerator plant. The burner system will be used for heating up the incinerator and afterwards to control the burning process.