Full title of the project
Services required for detailed design studies aiming at defining the optimal solution for the qualification of the LBB concept of the primary circuit including the surge line at the Unit 2 of ANPP.
Navigation path
Full title of the project
Services required for detailed design studies aiming at defining the optimal solution for the qualification of the LBB concept of the primary circuit including the surge line at the Unit 2 of ANPP.
Background
Introduction
Objectives
Background
Background
Background
The Russian Federation decided to transform and reinforce its State System of Accountancy and Control (SSAC) of nuclear materials. The kernel of this improvement was the implementation of modern SSAC approaches based on international experience.
Background