Objective
The objective of this project is:
Navigation path
Objective
The objective of this project is:
Objectives
The objective of this project was to provide the Commission with an independent expert evaluation whether the upgraded Kalinin NPP unit 3 would be in line with European safety objectives and practices.
Project
Objective
With this project a technical basis for the qualification of Non Destructive Examination (NDE) was intended to be established in Russia.
The project activities were divided into three (3) different fields of work:
Objective
The objective of this project is to support the Russian Nuclear Safety Authority Gosatomnadzor (GAN, the beneficiary) in its safety evaluation of the Balakovo NPP upgrading programme, i.e.:
Objective
This project addresses the licensing related assessments of the primary circuit integrity of nuclear power plants (NPP) and the application of the Leak-Before-Break (LBB) concept to the main piping in VVER-440N-230 type reactors.
The objective of the Tacis project consists in providing technical support to Gosatomnadzor of RF in its safety evaluation of the Kola units 3 & 4 upgrading Instrumentation and Control programme.
Objective
The main objective of this project was to co-operate with and assist the Safety Authorities of Russia (GAN) and related Technical Safety Organisations (TSO) to review:
Objective
The objective was to assist GAN in technical evaluation of the proposed safety upgrading measures, including design and operational aspects, related to Novovoronezh units 3 and 4.
Objective
Background
Background
Objective
General/History of the project
Objective
Project BE/RA/02 is a follow-up of project BE/RA/01 with almost the same objectives. The assistance in the field of emergency preparedness including planning and training was included as new objective. This project has 6 technical tasks.
Please refer to contract 27775
Background