Objective
This present project shall complete the work initiated under R1.03/94E and R1.03/95A.
In the frame of this project, the following tasks are to be performed:
Navigation path
Objective
This present project shall complete the work initiated under R1.03/94E and R1.03/95A.
In the frame of this project, the following tasks are to be performed:
Background
The TACIS 91 Project 4.2 “Crisis Management and Safety Panels” constituted the first phase of a global project aimed at providing a complete crisis management system to improve nuclear safety in Russian VVER 1000 nuclear power plants.
Background
Background
The feedwater control valves ensured, together with the variable speed feedwater pumps, the control of the feedwater flow to - and of the level in - the Steam Generators (SG’s).
Background
Objective
The aim of the project is the refurbishment of the present Process Monitoring System (PMS) with full consideration of the possibility to operate with PMS functions in the present as well as in the new system.
Background
Objective
Unit 5 is equipped with four SGs. To protect the SGs and corresponding system of live steam piping from pressure excess (for example at abnormal operation or in case of the accident) the following systems are to be replaced:
Objective
Objective
Procurement of Spare Parts for the Diagnostic Systems in Units 3 and 4.
At the beginning of 1990 VNIIAES has purchased from Siemens diagnostic systems like Acoustic Leakage-Detection, Loose Part Detection (Type SUES, KUES, ALUES) on a large scale.
Objective
Procurement of Spare Parts for the Diagnostic Systems in Units 3 and 4.
At the beginning of 1990 VNIIAES has purchased from Siemens diagnostic systems like Acoustic Leakage-Detection, Loose Part Detection (Type SUES, KUES, ALUES) on a large scale.
Objective
Procurement of Spare Parts (app. 100 different items) for different valves for Unit 5.
The original valves, 48 valves in total, for which spare parts are necessary (Gate valves, Globe valves, Check valves) were supplied in 1976 by GEC Alsthom-VELAN.
Background
Background
Objective
Objective
The objective of the project is to equip the BN 600 NPP with hardware, software and procedures for thermal visual inspection of the high voltage equipment for timely prevention of the accidents at the BN 600 NPP.
Beloyarsk Process Monitoring System (see projects R1.06/95E and R1.06/96B)
Background
Background
Objective