The project summary will be published after the completion of the project. The project has 2 components:
Search
Contract information field: Programme
Contract information field: Country
Contract information field: Budget year
Contract information field: Status
Contract information field: Contractor
- (-) Remove Riskaudit filter Riskaudit (12)
- BMS Consulting (1) Apply BMS Consulting filter
- Diakont (1) Apply Diakont filter
- DRC International (1) Apply DRC International filter
- FZR (Forschungszentrum Rossendorf) (1) Apply FZR (Forschungszentrum Rossendorf) filter
- IAEA (International Atomic Energy Agency) (1) Apply IAEA (International Atomic Energy Agency) filter
- Iberdrola (1) Apply Iberdrola filter
- NEW TRONIC SRL (1) Apply NEW TRONIC SRL filter
- NUVIA AS (1) Apply NUVIA AS filter
- Radiy (1) Apply Radiy filter
- RE (Rheinisch-Westfälisches Elektrizitätswerk) (1) Apply RE (Rheinisch-Westfälisches Elektrizitätswerk) filter
- SEMPELL AG (1) Apply SEMPELL AG filter
- Studsvik Scandpower (1) Apply Studsvik Scandpower filter
- ULYS Systems (1) Apply ULYS Systems filter
- VUJE (1) Apply VUJE filter
Contract information field: Sector
Contract information field: Types of activities
Contract information field: Partner (Beneficiary)
- (-) Remove State Nuclear Regulatory Committee of Ukraine (SNRCU) filter State Nuclear Regulatory Committee of Ukraine (SNRCU) (11)
- (-) Remove NNEGC Energoatom filter NNEGC Energoatom (1)
- Rostechnadzor (11) Apply Rostechnadzor filter
- Nuclear Regulatory Administration (NRA) of Ukraine (10) Apply Nuclear Regulatory Administration (NRA) of Ukraine filter
- Nuclear Regulatory Administration of Armenia (5) Apply Nuclear Regulatory Administration of Armenia filter
- Gosatomnadzor (4) Apply Gosatomnadzor filter
- Safety Authorities of Russia (GAN-RF) (3) Apply Safety Authorities of Russia (GAN-RF) filter
- GAN (Ukraine) (2) Apply GAN (Ukraine) filter
- Armenian Nuclear Regulatory Authority (ANRA) (1) Apply Armenian Nuclear Regulatory Authority (ANRA) filter
- Belarusian Department on Nuclear and Radiation Safety (Gosatomnadzor) within the Ministry for Emergency Situations (MES) (1) Apply Belarusian Department on Nuclear and Radiation Safety (Gosatomnadzor) within the Ministry for Emergency Situations (MES) filter
- Government of Egypt (1) Apply Government of Egypt filter
- Jordan Nuclear Regulatory Commission (JNRC) (1) Apply Jordan Nuclear Regulatory Commission (JNRC) filter
- Kazakhstan Atomic Energy Committee (KAEC) (1) Apply Kazakhstan Atomic Energy Committee (KAEC) filter
- Ministry for Emergency Situations (Belarus) (1) Apply Ministry for Emergency Situations (Belarus) filter
- Ministry of Environmental Protection of Ukraine (1) Apply Ministry of Environmental Protection of Ukraine filter
- The National Nuclear Energy Commission in Brazil (Comissão Nacional de Energia Nuclear; CNEN) (1) Apply The National Nuclear Energy Commission in Brazil (Comissão Nacional de Energia Nuclear; CNEN) filter
Contract information field: Meta geographical zone
Contract information field: Installation Types
Contract information field: Nuclear Power Plant
Contract information field: Nature
Contract information field: Method of procurement
The primary objective of this project was to strengthen and support the national nuclear safety regulatory system in Ukraine by promoting the integration of European Union (EU) regulatory practice. The project was considered successful in this respect.
UK/TS/31 was a 2+2 project, for support to the nuclear safety regulator of Ukraine (SNRCU) in the assessment of EU financed safety improvements within industrial project U1.04/03 "Upgrading of electrical equipment of reactor control and protection system and neutron flux monitoring equipment on K
UK/TS/32 was a technical support project including 2+2 tasks, for support to the nuclear safety regulator of Ukraine (SNRCU). It included 11 technical tasks mainly related to remaining modernisation steps of Khmelnitsky 2 and Rovno 4 (K2R4).
UK/TS/28 is a 2+2 project in which EU Technical Support Organisations support the Ukrainian Nuclear Safety Authority (SNRCU) in its activities on licensing related assessments of EU financed improvement measures in Zaporozhye NPP.
UK/TS/29 was a technical support project in which the nuclear safety authority of Ukraine (SNRCU) was supported in reviewing safety documentation, mainly related to Khmelnitsky 2 and Rovno 4 (K2R4).
1) Background
1) Background
The main objective of this project was to consolidate the achievements of the preceding projects (UK/RA/01,02,03) and to develop the assistance to SNRCU in the following fields:
1) Background
This project "Transfer of Western European Regulatory Methodology and practices to the nuclear safety authorities of Ukraine" was a follow up of a previous project which was implemented through two successive contracts.
2.3.1 Introduction
Beneficiary /location:SNRCU – State Nuclear Regulatory Committee of Ukraiine/ Kiev - Ukraine
Main contractor: RISKAUDIT IRSN/GRS International (GEIE)
The objective of this contract is to transfer experience of EU countries to the SNRCU and its TSO through support with:
This project is the second part of UK/TS/02-A, contract 25250. Please refer to that contract for the summary.