Objectives
Navigation path
Objectives
Background
Objective
Objective
Procurement of Spare Parts for the Diagnostic Systems in Units 3 and 4.
At the beginning of 1990 VNIIAES has purchased from Siemens diagnostic systems like Acoustic Leakage-Detection, Loose Part Detection (Type SUES, KUES, ALUES) on a large scale.
Objective
Background
Background
Objectives
Two prototypes of ECCS-pump (Emergency Core Cooling System) intake filters were designed, supplied and installed in the framework of this project, including the budget of project R1.02/96C.
Objectives
Objective
The objective was to deliver the following items:
Background
The project intended to implement at Kalinin Unit 2 (VVER 1000 type) a system allowing for diagnostic and monitoring of small leaks in equipment and piping of primary coolant circuit pressure boundary located inside the reactor containment.
Introduction
Background
TACIS programmes for Nuclear Safety agreed upon between the European Commission and the relevant beneficiaries of those states, contained provisions for on-site assistance.
Objective
Objective