Objective
The objective of the project was to implement the on-site assistance (OSA) at Kola NPP by a Western Consultant. This assistance by the Consultant was the subject of a formal contract between EC and the Consultant.
Result
Navigation path
Objective
The objective of the project was to implement the on-site assistance (OSA) at Kola NPP by a Western Consultant. This assistance by the Consultant was the subject of a formal contract between EC and the Consultant.
Result
Objective
The objective of this project was to prepare the basic design for the modernization of the Reactor Protection System on Units 3 and 4.
Result
Objective
Objective (phase 2)
The objective of this project was to continue the work started in a first phase under the same project number. This project is to be seen as a contractual extension of the previous one with the same number R1.06/7/92.
Result
Background
Objective
Background
Objective
The overall project aimed to develop and deliver simulation tools to be installed on the VVER-440-NPP sites (230/213). Multifunctional Simulators (MFS) had to be supplied and delivered to Novoronezh Training Centre and Kola NPP.
Objective
Objective
The Beneficiary requested spare parts for In-Service-Inspection Equipment, which has been delivered by a Western Company in the last 20 years to the Soviet Union.
An extensive list of parts to be purchased has been set up by the Beneficiary.
Objective
Objectives
The guiding objective of this project was to assist the Government of the Russian Federation to establish a legally based independent and technically strong regulatory authority.
Objective
Some Reference Documents indicated the tendency to unstable behaviour of VVER-1000 reactor cores (e.g. Xe oscillations).
Objective
Mainly for application in the primary loop, VNIIAES has developed a diagnostic centre for:
Objective
Background:
Objective
Objectives
Objectives
Objectives
Objectives